background image

6%2)3).$5342)%3

CURRENT MONITORING

INSTALLATION GUIDE

 Z201495-0A 

page 1 

©2007 Veris Industries   USA 800.354.8556 or 503.598.4564  / support@veris.com   

03071

Split-Core, Adjustable Current Switch

with 120VAC/DC Output

quick install

1. Plan the installation:  

Locate a mounting surface for the removable mounting bracket that will allow the 
monitored conductor to pass through the iris, or "window" when it is installed. Determine 
cable routing for the controller connection, allowing wiring to reach the mounting location.

2. Install mounting bracket  

Drill holes to mount the bracket to the chosen surface using the included screws.

3. Wire the output connections between the sensor and the controller (solid-state contact).

4. Snap the sensor over the wire to be monitored and clip the assembly to the mounting bracket.

5. Calibrate the sensor (see page 2) with the load running normally.

6. Close up and power up!

Installer's Specifications

DANGER

'BOPS1VNQ

$0/530--&3

%JHJUBM

*OQVU

7&3*4*/%6453*&4

1PSUMBOE0SFHPO

$0/5"$503

.0503

*OTVMBUFE$POEVDUPS

Wiring Example

H909

909

NOTICE

Dimensions

Amperage Range 

2.5 to 135A Continuous*

Sensor Supply Voltage 

Induced from monitored conductor

Isolation 

600VAC rms.

Temperature Range 

-15º to 60º C

Humidity Range 

10-90% RH non-condensing

Status Output  

N.O. 200mA@120VAC/DC

On-State Resistance (max)  

20 ohms

Off-State Resistance (min)  

1 megohm

*When operating at 50Hz, low threshold may be 2.6A

3.7"

(94 mm)

3.3"

(84 mm)

.2”

(5 mm)

3"

(76 mm)

1.1"

(27 mm)

Self-gripping Iris 

1.1"

(28 mm)

0.8"

(20 mm) 

Removable Mounting Bracket 

2.8"

(71 mm)

Reviews: