6%2)3).$5342)%3
CURRENT MONITORING
INSTALLATION GUIDE
Z201495-0A
page 1
©2007 Veris Industries USA 800.354.8556 or 503.598.4564 / support@veris.com
03071
Split-Core, Adjustable Current Switch
with 120VAC/DC Output
quick install
1. Plan the installation:
Locate a mounting surface for the removable mounting bracket that will allow the
monitored conductor to pass through the iris, or "window" when it is installed. Determine
cable routing for the controller connection, allowing wiring to reach the mounting location.
2. Install mounting bracket
Drill holes to mount the bracket to the chosen surface using the included screws.
3. Wire the output connections between the sensor and the controller (solid-state contact).
4. Snap the sensor over the wire to be monitored and clip the assembly to the mounting bracket.
5. Calibrate the sensor (see page 2) with the load running normally.
6. Close up and power up!
Installer's Specifications
DANGER
'BOPS1VNQ
$0/530--&3
%JHJUBM
*OQVU
7&3*4*/%6453*&4
1PSUMBOE0SFHPO
$0/5"$503
.0503
*OTVMBUFE$POEVDUPS
Wiring Example
H909
909
NOTICE
Dimensions
Amperage Range
2.5 to 135A Continuous*
Sensor Supply Voltage
Induced from monitored conductor
Isolation
600VAC rms.
Temperature Range
-15º to 60º C
Humidity Range
10-90% RH non-condensing
Status Output
N.O. 200mA@120VAC/DC
On-State Resistance (max)
20 ohms
Off-State Resistance (min)
1 megohm
*When operating at 50Hz, low threshold may be 2.6A
3.7"
(94 mm)
3.3"
(84 mm)
.2”
(5 mm)
3"
(76 mm)
1.1"
(27 mm)
Self-gripping Iris
1.1"
(28 mm)
0.8"
(20 mm)
Removable Mounting Bracket
2.8"
(71 mm)