Technical Datasheet, installation and Operation Manual 

 3 

 
 

SOLID FUEL BOILERS  

 

 

SIRIJUS 20 
SIRIJUS 30 

 

 

 

 
 
 

LST EN 303-5      GOST 20548 

 
 
 
                          

ENG 

Si

ri

ju

s

 2

0

3

0

 (1

3

.0

5

) V1

 L

T

 

Summary of Contents for SIRIJUS 20

Page 1: ...Technical Datasheet installation and Operation Manual 3 SOLID FUEL BOILERS SIRIJUS 20 SIRIJUS 30 LST EN 303 5 GOST 20548 ENG Sirijus 20 30 13 05 V1 LT ...

Page 2: ...eipt purchase of the product signature Table of Contents 1 General information 4 2 Technical Data 5 3 Description of the Design 6 4 Transportation and Storage 7 5 Installation of the boiler 7 5 1 Mounting location 7 5 2 Chimney and Flue 7 5 3 Connection to the Heating System 8 5 4 Connection of the Boiler Cooling System 10 6 Operation of the Boiler 12 6 1 Firing 12 6 2 Adjustment of Draft Control ...

Page 3: ...ificate of acceptance is filled in completely and correctly 12 WARRANTY CLAIM FORM To General Director of JSC Umega I have acquired the product made by name surname or name of company your company serial No product name date of manufacture date place of purchase name and number of the purchase document I have read the product data sheet and hereby declare that the product has been installed in acc...

Page 4: ...applicable to the product from that day I have read the terms of warranty _______________________________________________________ Buyer s surname signature and date In the event of faults during installation or use of the boiler please call 370 687 95628 370 340 60532 370 340 60533 370 340 60538 If you have claims against the product quality please fill in the warranty claim form and along with a ...

Page 5: ...ose the rest of them according to environmental requirements 9 RISK ANALYSIS AND TROUBLESHOOTING Problem Cause Action Temperature of the heat carrier above the allowable level Thermostatic cooling valve has not been installed bottom door is opened automatic pressure adjustment does not operate recycling pump does not operate lost electricity Be sure to install the thermostatic cooling valve into t...

Page 6: ...he firegrating there is an ash box 7 which can be removed by opening the bottom door 16 The bottom door is fitted with a primary air suction valve 8 which is controlled by an automatic temperature controller 10 by using a lever 12 and the chain 11 The temperature controller is fitted in the right part of the boiler In front there is fitted a thermometer 13 showing a temperature of the heat carrier...

Page 7: ...r supply valve 17 Hang off the chain 11 from the primary air suction valve 8 the valve as well as the bottom door 16 must be closed Then carefully semi open the top door wait 2 3 seconds and carefully open the top door The smoke should not enter the room If the room gets smoked it means that any of the valves may be still closed or the primary air suction valve is still opened After loading a fuel...

Page 8: ...valve 8 at the bottom door Adjust the temperature controller lever so that the scale reading could match the reading of the boiler thermometer the length of chain 11 is selected so that the primary air suction valve is closed Keep in mind that the bolt that fixes the temperature controller lever to the plug should be in front while the lever should be positioned as shown on Picture 1 that is slope...

Page 9: ... close to the boiler water conduit pos 20 as possible see Picture 1 It can be mounted in a vertical or horizontal position The valve must not be mounted with a valve head downward see Picture 3 Forbidden Position Picture 3 Mounting positions of the thermostatic cooling valve Regulus DBV 1 A valve tube A see Picture 4 is connected to the cold water conduit pressure in the system should not exceed 6...

Reviews: