background image

168

1

2

 [4280mm]

178

1

2

 [4534mm]

178

1

2

 [4534mm]

168

1

2

 [4280mm]

DOUBLE DOOR

79

3

8

 [2016mm]

124

1

2

 [3162mm]

79

3

8

 [2016mm]

123

1

16

 [3125mm]

191 [4851mm]

INSTRUCTIONS

0226_Granada_AC_14x14_Instructions_V2.0

GRANADA

CODE: 0226

TOLL FREE: 1-877-795-7423

EN

Summary of Contents for 0226

Page 1: ...1 2 4534mm 1781 2 4534mm 168 1 2 4280mm DOUBLE DOOR 79 3 8 2016mm 124 1 2 3162mm 79 3 8 2016mm 123 1 16 3125mm 191 4851mm INSTRUCTIONS 0226_Granada_AC_14x14_Instructions_V2 0 GRANADA CODE 0226 TOLL FREE 1 877 795 7423 EN ...

Page 2: ......

Page 3: ...E PARTS LIST AS A CHECKLIST FOR COMPONENTS UNWRAP PARTS ONLY AS NEEDED TO KEEP COMPONENT DEALER CODE LABEL INTACT FOR REFERENCE TWO PERSON PROJECT PRODUCT CAN BE HEAVY USE CARE WHEN LIFTING SITE PREPARATION ASSEMBLE THE STRUCTURE ON A FIRM LEVEL SURFACE PROTECT THE PRODUCT FROM DAMAGE AS SOME PIECES MAY BE FRAGILE ESTIMATED ASSEMBLY TIME 8 HOURS IF YOU REQUIRE ASSISTANCE OR NEED TO ORDER REPLACEME...

Page 4: ......

Page 5: ...513 4813 16 4X 1440 48 4X 1442 4X 1443 95 671 2 4X 2410 471 2 4X 1444 671 2 4X 1449 861 2 4X 1450 861 2 1X 1186 1X 2278 4X 2119 18 4X 4X 1039 4X 1304 793 8 34 4X 1351 4X 1354 4X 1355 861 4 84 581 4 0226_Granada_AC_14x14_Instructions_V2 0 GRANADA CODE 0226 PAGE OF DE TOLL FREE 1 877 795 7423 PANELS PANNEAUX MEASUREMENTS ARE APPROXIMATE MESURES SONT APPROXIMATIVES TRUSS FRAME FERME DE TOIT EN ...

Page 6: ......

Page 7: ...8 4X 2186 2184 2185 2187 2189 4X 4X 4X 0226_Granada_AC_14x14_Instructions_V2 0 GRANADA CODE 0226 PAGE OF DE TOLL FREE 1 877 795 7423 MEASUREMENTS ARE APPROXIMATE MESURES SONT APPROXIMATIVES ROOFING TOITURE EN ...

Page 8: ......

Page 9: ...Granada_AC_14x14_Instructions_V2 0 GRANADA CODE 0226 TOLL FREE 1 877 795 7423 A 1 1 2 8 FLAT HEAD 2 ROBERTSON 58X B 2 1 2 8 FLAT HEAD 2 ROBERTSON 231X C 3 1 2 10 FLAT HEAD 2 ROBERTSON 88X L 2 1 2 SCREW 8 HEX HEAD 1 4 HEAD 24X M 3 SCREW 8 HEX HEAD 1 4 HEAD 48X 2 1 2 PAN HEAD ROBERTSON SCREWS 2 ROBERTSON F 44X I 1 10 METAL ROOF SCREW 1 4 HEAD 220X 2 PAN HEAD ROBERTSON SCREWS 2 ROBERTSON P 32X EN ...

Page 10: ......

Page 11: ...REE 1 877 795 7423 EN STEP 1 ATTACH TOGETHER TRUSS FRAME PIECES DC 1351 1354 1355 THE COMPONENTS SHOULD FIT AS TIGHTLY TOGETHER AS POSSIBLE REPEAT THIS TO BUILD A TOTAL OF FOUR TRUSS FRAME LENGTHS 3 1 2 ROBERTSON SCREWS 40 req DC 1351 DC 1355 DC 1354 C x4 ...

Page 12: ...ME LENGTHS OVER AND LAY THEM OUT TO FORM A SQUARE ATTACH THE CORNERS TOGETHER AS SHOWN IN DIAGRAM 1 FASTEN ALL FOUR CORNERS IN THE SAME FASHION MEASURE THE TRUSS FRAME TO VERIFY SQUARENESS THE MEASUREMENT FROM A TO D MUST EQUAL B TO C ADJUST THE TRUSS FRAME UNTIL BOTH MEASUREMENTS ARE EQUAL A TO D B TO C THE TRUSS FRAME ASSEMBLY MUST BE SQUARE B ...

Page 13: ...MAIN SQUARE DOUBLE CHECK CORNER TO CORNER MEASUREMENTS ONCE BRACES ARE ATTACHED LAY THE SQUARED TRUSS FRAME ASSEMBLY AT THE EXACT LOCATION YOU WISH YOUR GAZEBO TO BE USING A PENCIL OR MARKER TRACE THE OUTSIDE EDGES OF ALL FOUR CORNERS ONTO THE GROUND THESE MARKINGS WILL BE HELPFUL IN PLACING YOUR CORNER POSTS AND PANELS IN THE STEPS TO COME ONCE MARKINGS ARE COMPLETE MOVE THE TRUSS FRAME UP AND OU...

Page 14: ...LAY THE DOOR HEADER DC 2086 AND DOOR THRESHOLD DC 2087 FLAT ON THE GROUND GRANADA 0226_Granada_AC_14x14_Instructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 4 DC 2086 DC 2087 ...

Page 15: ...0 TOLL FREE 1 877 795 7423 EN STEP 5 PLACE THE LEFT DOOR UPRIGHT DC 2081 ON TOP OF THE DOOR HEADER DC 2086 AND DOOR THRESHOLD DC 2087 ATTACH THE DOOR TO THE HEADER AND THRESHOLD USING 2 1 2 SCREWS DC 2081 FLUSH FLUSH 2 1 2 ROBERTSON SCREWS 4 req B ...

Page 16: ...s_V2 0 TOLL FREE 1 877 795 7423 EN STEP 6 DC 2099 FLUSH FLUSH PLACE THE RIGHT DOOR UPRIGHT DC 2099 ON TOP OF THE HEADER DC 2086 AND THRESHOLD DC 2087 ATTACH THE DOOR TO THE HEADER AND THRESHOLD USING 2 1 2 SCREWS 2 1 2 ROBERTSON SCREWS 4 req B ...

Page 17: ...7 795 7423 EN STEP 7 CONTINUE TO FASTEN THE HEADER DC 2086 AND THRESHOLD DC 2087 TO THE LEFT AND RIGHT UPRIGHTS DC 2081 DC 2099 USING 2 1 2 SCREWS AT THE LOCATIONS SHOWN 2 1 2 ROBERTSON SCREWS 8 req B FLUSH FLUSH FLUSH FLUSH TOP OF DOOR FRAME OUTSIDE OF DOOR FRAME ...

Page 18: ...IF YOU HAVE PURCHASED AN OPTIONAL BAY WALL KIT FOR YOUR OUTDOOR STRUCTURE PLEASE MOVE ON TO STEP ONE OF THE INSTRUCTIONS PROVIDED WITH THE BAY KIT AT THIS TIME OPTIONAL BAY KIT ...

Page 19: ...2 4 2 1 D C 2 4 2 2 D C 2 4 2 2 DC 1039 DC 2421 DC 2422 ATTACH WALL PANELS DC 2421 and or 2422 OR DOOR PANEL ASSEMBLY TO EACH CORNER POST DC 1039 NOTE THE SCREW LOCATIONS IN THE DIAGRAM WALL PANELS ARE TO BE FLUSH WITH THE INSIDE OF THE POST AND FLUSH AT TOP AND BOTTOM IF YOU WANT THE DOOR TO BE LOCATED TIGHT TO A CORNER SUBSTITUTE A WALL PANEL FOR THE DOOR PANEL MOVE ALL FOUR ASSEMBLIES TO THE GR...

Page 20: ...AND THE DOOR PANEL CONTINUE THE SAME SCREW PATTERN FROM THE PREVIOUS STEP WALL PANELS ARE TO BE FLUSH WITH EACH OTHER AND FLUSH AT TOP AND BOTTOM 2 1 2 BLACK PAN HEAD ROBERTSON SCREWS 44 req F REFERENCE MARK REFERENCE MARK 21 2 CRITICAL TO USE 2 1 2 SCREWS FOR FASTENING THE PANELS TOGETHER 2 1 2 SCREWS F WHEN HANDLING THE DOOR PANEL ASSEMBLY ENSURE THE PIN LOCK AND HANDLE CATCH ARE ENGAGED ...

Page 21: ...F THE DOOR WHILE THE SECOND PERSON ALIGNS THE HINGES WITH THE PRE PUNCHED HOLES FOUND ON THE DOOR FRAME 1 1 2 ROBERTSON SCREWS 15 req A LARGE GLASS PANE HINGE HOLES PRE PUNCHED HOLES ON DOOR FRAME PASSIVE DOOR PASSIVE DOOR PASSIVE DOOR HINGE SMALL GLASS PANE LOCKING PIN LOCKING PIN ONCE INSTALLED ENGAGE THE DOOR S LOCKING PINS TO PREVENT THE DOOR FROM SWINGING FOR PROPER DOOR FUNCTION THE SCREWS M...

Page 22: ...OR HINGE LOCATE THE ACTIVE DOOR ORIENT THE DOOR UPRIGHT SO THE LARGE PANE OF GLASS IS ON TOP OF THE SMALL PANE OF GLASS HAVE ON PERSON SUPPORT THE WEIGHT OF THE DOOR WHILE THE SECOND PERSON ALIGNS THE HINGES WITH THE PRE PUNCHED HOLES FOUND ON THE DOOR FRAME LARGE GLASS PANE SMALL GLASS PANE DOOR FRAME FOR PROPER DOOR FUNCTION THE SCREWS MUST BE INSERTED IN PRE PUNCHED HOLES ON THE DOOR FRAME ...

Page 23: ... 0226_Granada_AC_14x14_Instructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 12 ORIENTATE FLAT SURFACES REMOVE KEY FROM LOCK ASSEMBLY 1 2 3 LOCATE THE DOOR HANDLE DC 2386 AND ASSEMBLE THE LOCK 1 2 3 FLAT SURFACES ...

Page 24: ...DE THE HANDLE ASSEMBLY WITH THE FLAT SPINDLE AND SQUARE SPINDLE THROUGH THE HOLES IN THE DOOR ON THE INSIDE OF THE DOOR POSITION THE DEADLOCK OVER THE FLAT SPINDLE FASTEN THE DEADLOCK TO THE HANDLE ASSEMBLY WITH THE SCREWS PROVIDED HOLD THE OUTSIDE HANDLE IN ITS PROPER POSITION HORIZONTAL WITH THE HANDLE POINTING TOWARDS THE HINGE GUIDE THE LATCH OVER THE SQUARE SPINDLE FASTEN THE LATCH WITH THE T...

Page 25: ...ARRIAGE BOLTS THROUGH THE TWO HOLES OF THE PASSIVE LEFT DOOR FROM THE OUTSIDE IN SLIP THE STRIKE PLATE DC 2387 OVER THE ENDS OF THE BOLTS TIGHTEN THE STRIKE PLATE TO THE DOOR WITH WASHERS AND NUTS OVER TIGHTENING THE BOLTS WILL BEND THE DOOR FRAME ACTIVE DOOR PASSIVE DOOR PASSIVE DOOR STRIKE PLATE DC 2387 ...

Page 26: ... CLOSE FIRMLY TIGHTEN THE NUTS TO SET THE STRIKE PLATE DOOR ALIGNMENT TO ADJUST AND ALIGN THE DOORS USE THE BLACK PLASTIC SHIMS AS PROVIDED WORK ON ONE HINGE AT A TIME ADD SHIMS BETWEEN THE HINGE AND DOOR FRAME TO ADJUST THE DOORS ALIGNMENT AND ANGLE THE DOORS SHOULD SWING FREELY WITHOUT BINDING ON THE FRAME STRIKE PLATE DC 2387 BLACK PLASTIC SHIM OVER TIGHTENING THE BOLTS WILL BEND THE DOOR FRAME...

Page 27: ..._V2 0 TOLL FREE 1 877 795 7423 EN STEP 16 INSTALL FILLER STRIPS FOR PANEL JOINTS UNWRAP THE FILLER STRIPS DC 2069 SLIDE ONE FILLER STRIP IN EACH PANEL JOINT THE FILLER STRIPS WILL SIT LOOSE IN THE JOINTS DC 2069 DC 2069 DC 2069 DC 2069 DC 2069 ...

Page 28: ...LS ARE TO BE FLUSH WITH THE OUTSIDE OF THE TRUSS FRAME ASSEMBLY SCREW DOWN THROUGH THE PLATE OF THE TRUSS FRAME ASSEMBLY INTO THE TOP OF EACH WALL AND DOOR PANEL USE THREE SCREWS PER WALL PANEL AND FOUR PER DOOR PANEL FLUSH TRUSS FRAME OUTSIDE WALL PANEL OUTSIDE B IT IS RECOMMENDED TO HAVE ONE WALL SCREWED FROM THE PANEL UP INTO THE TRUSS FRAME IN CASE OF SERVICING NEEDS FOR FURNITURE OR SPA SCREW...

Page 29: ...K FRAME DC 1186 ON A FLAT SURFACE ATTACH COMMON RAFTERS DC 2406 TO THE PEAK FRAME DC 1186 CENTRED ON EACH SIDE THE BOTTOM EDGE OF THE RAFTERS ARE TO BE FLUSH WITH THE BOTTOM OF THE PEAK FRAME 3 HEX HEAD SCREWS 16 req DC 2406 DC 2406 DC 2406 DC 2406 DC 2406 DC 2406 FLUSH SECTION VIEW M DC 1186 DC 1186 SERIAL AND SNOW TAGS FLUSH ...

Page 30: ...ructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 19 2 1 2 HEX HEAD SCREWS 8 req PLACE THE COLLAR TIES DC 2513 TOGETHER AS SHOWN AND ATTACH EACH COLLAR TIE TO NEXT 2 11 16 FROM THE END WITH 2 1 2 HEX HEAD SCREWS AS SHOWN TOP PLAN VIEW L DC 2513 DC 2513 DC 2513 DC 2513 ...

Page 31: ...EE 1 877 795 7423 EN STEP 20 2 1 2 HEX HEAD SCREWS 16 req ATTACH THE COLLAR TIE ASSEMBLY WITH FOUR 2 1 2 HEX HEAD SCREWS THOUGH EACH COLLAR TIE INTO EACH COMMON RAFTER AS SHOWN IN THE DETAIL VIEW SECTION VIEW L DC 2513 DC 2513 DC 2513 DC 2406 LINE UP FLUSH ...

Page 32: ...4_Instructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 21 TOP PLAN VIEW SECTION VIEW FLIP FRAME AND RAFTER ASSEMBLY OVER AND PLACE ON TRUSS FRAME SQUARE THE RAFTERS TO THE TRUSS FRAME DO NOT FASTEN RAFTERS TO THE TRUSS FRAME AT THIS TIME ...

Page 33: ...tions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 22 TOP PLAN VIEW SECTION VIEW 3 HEX HEAD SCREWS 16 req ATTACH HIP RAFTERS DC 2408 THE BOTTOM EDGE OF THE RAFTER IS TO BE FLUSH WITH THE BOTTOM EDGE OF THE PEAK FRAME DO NOT SECURE THE RAFTERS TO THE TRUSS FRAME AT THIS TIME D C 2 4 0 8 D C 2 4 0 8 D C 2 4 0 8 D C 2 4 0 8 M ...

Page 34: ...X HEAD SCREWS 16 req M ATTACH THE FOUR LEFT DC 2411 AND FOUR RIGHT DC 2410 JACK RAFTERS TO THE HIP RAFTERS AS SHOWN PLACE THE JACK RAFTERS SO THEY LINE UP WITH THE HIP RAFTER AS SHOWN IN DETAIL VIEW DC 2410 DC 2411 DC 2411 DC 2410 DC 2410 DC 2411 DC 2411 DC 2410 D C 2 4 1 0 DC 2411 LINE UP ...

Page 35: ...TRUSS FRAME FROM THE OUTSIDE OF THE GAZEBO AS SHOWN IN SECTION DETAIL BEFORE YOU ATTACH THE COMMON RAFTERS MAKE SURE THAT THE RAFTERS ARE POSITIONED IN THE CORRECT PLACE AS SHOWN THE COMMON RAFTERS SHOULD BE CENTRED FROM THE CORNER ON THE SIDES THE LEFT AND RIGHT JACK RAFTERS SHOULD BE 45 FROM THE CORNER ALL MEASUREMENTS ARE TO THE CENTRE OF THE RAFTER SECTION DETAIL C ...

Page 36: ...IF YOU HAVE PURCHASED AN OPTIONAL BAY WALL KIT FOR YOUR OUTDOOR STRUCTURE PLEASE MOVE ON TO STEP THREE OF THE INSTRUCTIONS PROVIDED WITH THE BAY KIT AT THIS TIME OPTIONAL BAY KIT ...

Page 37: ...ME FASTEN THE MID STRAPPING PIECES DC 1442 1443 DC 1444 TO THE RAFTERS PLACE THE BOTTOM TWO STRAPPING PIECES DC 1449 DC 1450 AT THE BOTTOM OF THE ROOF TIGHT AGAINST THE 2x2 OF THE RAFTERS THE ANGLE CUTS ARE TO BE FACE DOWN AND LOCATED AT THE HIP RAFTERS REPEAT THIS STEP ON ALL FOUR SIDES 2 1 2 ROBERTSON SCREWS 128 req B DC 1440 DC 1442 DC 1444 DC 1450 DC 1443 DC 1449 ...

Page 38: ...STRAPPING AND PANEL SUPPORTS ALIGN THE HIP COVER SO IT IS CENTRED ON THE RAFTER AND THE BOTTOM JUST TOUCHES THE OUTSIDE OF THE PANEL SUPPORT AS SHOWN FASTEN THROUGH THE HIP CAP COVER INTO THE PANEL SUPPORTS AND TOP STRAPPINGS DETAIL 1 FLUSH FLUSH PANEL SUPPORT DC 2359 DC 2359 DC 2359 1 1 2 ROBERTSON SCREWS 16 req A DC 2359 DC 2359 DC 2359 ...

Page 39: ...C_14x14_Instructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 27 FASTEN HIP RAFTER EXTENSION DC 2119 TO TRUSS FRAME ASSEMBLY REPEAT THIS STEP ON ALL FOUR HIP RAFTERS DC 2119 2 1 2 ROBERTSON SCREWS 16 req B HIP RAFTER STRAPPING ...

Page 40: ...77 795 7423 EN STEP 28 ATTACH CLOSURE TABS DC 1834 TO THE UNDERSIDE OF THE ROOFING SHEETS CLOSURE TABS ARE TO BE IN LINE WITH THE FIRST ROW OF PUNCHED SCREW LOCATIONS TRIM CLOSURE TABS FOR NARROW ROOF PANELS SECTION VIEW DC 1834 CLOSURE TAB DC 1834 ROOFING SHEET ...

Page 41: ...HE OUTSIDE EDGE OF SKYLIGHT FRAME NOT ON TOP OF THE FRAME FASTEN THE ROOFING SHEETS DC 2184 2185 2186 2187 2188 2189 TO THE ROOF STRUCTURE USING THE 1 ROOF SCREWS THROUGH THE PRE PUNCHED HOLES REPEAT THIS STEP ON ALL FOUR SIDES DO NOT OVERTIGHTEN SCREWS 1 ROOF SCREWS 196 req I DC 2185 DC 2187 DC 2189 DC 2184 DC 2186 DC 2188 ...

Page 42: ...GRANADA 0226_Granada_AC_14x14_Instructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 30 SEALING TAPE DC 2033 CAREFULLY PEEL THE BACKER AND PLACE THE SEALING TAPE DC 2033 ON TOP OF THE ROOFING SHEET ...

Page 43: ...HE SEALING TAPE DC 2033 OVER TOP OF THE JOINT BETWEEN THE ROOFING SHEETS APPLY PRESSURE TO ADHERE THE TAPE TO THE CONTOUR OF THE ROOFING SHEETS ONCE ADHERED FULLY TRIM AT EDGE OF THE ROOFING SHEET AS SHOWN IN DETAIL 1 REPEAT THIS ON ALL FOUR SIDES THE SEALING TAPE MUST BE CENTERED ON THE JOINT CENTRE ON JOINT DETAIL 1 ...

Page 44: ... 0 TOLL FREE 1 877 795 7423 EN STEP 32 1 1 2 ROBERTSON SCREWS 12 req SECTION VIEW A PLACE THE PEAK CAP ASSEMBLY DC 2278 INTO POSITION ON TOP OF THE FRAME FASTEN THE PEAK CAP ASSEMBLY TO THE FRAME FROM THE INSIDE USE THREE SCREWS ON ANGLE PER SIDE ...

Page 45: ...ETAL HIP CAPS DC 1416 ON EACH CORNER OF THE ROOF AS SHOWN PLACE EACH CAP SO THAT THE TOP OF THE CAP FITS TIGHT INTO THE CORNER OF THE SKYLIGHT FRAME UNDER THE SKYLIGHT FLASHING MAKE SURE THAT THE CAP IS SITTING CENTRED ON THE HIP THEN ATTACH IT THROUGH THE ROOFING SHEET AND INTO THE STRAPPING SCREWS MUST BE FASTENED THROUGH THE TOP RIBS OF THE ROOFING SHEET ONLY DO NOT OVER TIGHTEN OR THE HIP CAPS...

Page 46: ...IF YOU HAVE PURCHASED AN OPTIONAL BAY WALL KIT FOR YOUR OUTDOOR STRUCTURE PLEASE MOVE ON TO STEP THREE AND FOUR OF THE INSTRUCTIONS PROVIDED WITH THE BAY KIT AT THIS TIME OPTIONAL BAY KIT ...

Page 47: ...OLLAPSE TO OPEN THE WINDOW ALL THE WAY TO ONE SIDE WHEN THE WINDOW IS COMPLETELY OPEN SLIDE THE NYLON STOPPERS IN THE FRAME TIGHT AGAINST THE STATIONARY SIDE OF THE WINDOW AND TIGHTEN THE SET SCREW GRANADA 0226_Granada_AC_14x14_Instructions_V2 0 TOLL FREE 1 877 795 7423 EN STEP 34 ...

Page 48: ......

Reviews: