background image

RACK-2300 CHASSIS

USER’S MANUAL

Summary of Contents for RACK-2300

Page 1: ...RACK 2300 CHASSIS USER S MANUAL...

Page 2: ...nual may be reproduced copied or translated without prior notice to ICP Electronics Inc The information provided in this document is for reference only We do not assume any responsibility arising out...

Page 3: ...Chapter 2 System Setup 2 1 Front Panel of RACK 2300 2 2 LP 01 Control Panel of RACK 2300 2 3 Rear Panel of RACK 2300 2 4 Removing the chassis cover 2 5 Backplane Installation 2 6 Disk Drives Installat...

Page 4: ...on 19 Rack or Desktop with the supplied brackets 1 2 Product Specifications General specification Construction Heavy duty steel Disk Driver One 5 25 Removable Disk Drive one FDD Disk Driver and one 3...

Page 5: ...ive Vibration 5 17Hz 0 1 double amplitude displacement 17 640Hz 1 5G acceleration peak to peak Shock 10G acceleration peak to peak Safety approval meet CE FCC Cooling Fan 3 front ball bearing cooling...

Page 6: ...1 3 Dimensions RESET POWER BUZZER HDD 44 32 483 466 550 19 440...

Page 7: ...llation Procedure The following set up procedures are provided to assist you in installing the system unit please follow the steps below 2 1 Front Panel of RACK 2300 POWER LED RESET SWITCH HDD LED BUZ...

Page 8: ...nel BZ1 BUZZER D1 POWER LED D2 System HDD LED SW1 RST system reset button CN1 Pin FUNCTION 1 SPEAKER 2 SPEAKER 3 POWER LED 4 POWER LED 5 HDD LED 6 HDD LED 7 RESET 1 1 8 8 RESET 2 1 3 4 2 5 6 7 8 Pin B...

Page 9: ...CK 2300 2 4 Removing the chassis cover The cover is mounted by eight screws on the top of the chassis remove them and slide the cover to the rear of the chassis Figure below shows how to remove the ch...

Page 10: ...ow illustrates how to install the backplanes on the RACK 2300 Please plug the connector of ACE 1010A to the Backplane IP 2SD2 PCI 2SD2 STEP1 STEP2 BACKPLANE PCI 2SD2 HDD LED RED BUZZER POWER LED GREEN...

Page 11: ...ive cover 2 Mount the drive rails on the side of FDD 3 Attach the FDD to the bracket with four screws and connect FDD cable power cable to the FDD 4 Directly fix the 3 5 HDD with four screws into chas...

Page 12: ...2 7 Power Supply Installation...

Page 13: ...APPENDIX A PASSIVE BACKPLANES 7 50 7 00 154 00 23 00 30 50 7 00...

Page 14: ...APPENDIX B EXPLODED DIAGRAM...

Page 15: ...PIN1 NC PIN16 5V PIN2 5Vsb PIN17 3 3V PIN3 5Vsb PIN18 3 3V PIN4 GND PIN19 3 3V PIN5 GND PIN20 3 3V PIN6 GND PIN21 5V PIN7 GND PIN22 12V PIN8 GND PIN23 3 3Vsb PIN9 GND PIN24 12V PIN10 GND PIN25 12V PIN...

Page 16: ...1A 0A 0A 3 3V MAX other MIN HLLLL 12 0 A 1 5 A 0 1A 0A 0A 12V MAX other MIN LLHLL 0 3A 3 0 A 5 0A 0A 0A ALL MIN LLLLL 0 3 A 1 5 A 0 1A 0A 0A HOLD UP TIME FULL LOAD 115V 60Hz 17 mSec Minimum 230V 50Hz...

Page 17: ...ime 10 ms max INPUT ELECTRICAL SPECIFICATIONS VOLTAGE RANGE PARAMETER MIN NOM NAX UNITS V in Range 95 115 230 264 V rms INPUT FREQUENCY NOMINAL FREQUENCY 115V 60Hz 230V 50Hz INRUSH CURRENT Cold start...

Page 18: ...ns TEMPERATURE RANGE Operating 0 to 40 deg C Storage 20 to 80 deg C HUMIDITY Operating 5 95 RH Non condensing Storage 5 95 RH Non condensing VIBRATION Vibration Operating Sine wave excited 0 25 G maxi...

Reviews: