INSTALLATION INSTRUCTIONS

ECOplus Solar Storage

Figure 1  ECOplus solar storage

Content

1  General Safety Notes                                                      2
1 1  Standards and Codes                                                                             2
1 2  Qualifications of the Installer                                       2
1 3  Intended Use and Application                                      2
2  Scope of supply                                                              2
3 Installation                                                                      2
3 1 Preparation                                                                      2
3 2  Setting up the Storage                                                  2
3 3  Connecting the Domestic Water Circuit                             4
3 4  Connecting the Solar- and Auxiliary Heating Circuit           5
3 5  Connecting Backup Heater                                          5
3 6  Installing Temperature Sensors                                   5

3 7  Install a Impressed Current Anode                              6
4  Startup of the System                                                                             6
4 1  Acceptance Protocol                                                      6
4 2  System Check                                                                  6
4 3  Flushing the Installation                                                                       6
4 4  Settings at Boiler and Solar Controllers                      6
4 5  Filling, Venting, Pressure Check                                   6
5  Place the Insulation                                                                                   7
6 Troubleshooting 

                                                            8

7 Maintenance                                                                  8
8  Disassembly and Recycling                                          8

Summary of Contents for ECOplus

Page 1: ...ration 2 3 2 Setting up the Storage 2 3 3 Connecting the Domestic Water Circuit 4 3 4 ConnectingtheSolar andAuxiliary Heating Circuit 5 3 5 Connecting Backup Heater 5 3 6 Installing Temperature Sensors 5 3 7 Install a Impressed Current Anode 6 4 Startup of the System 6 4 1 Acceptance Protocol 6 4 2 System Check 6 4 3 Flushing the Installation 6 4 4 Settings at Boiler and Solar Controllers 6 4 5 Fi...

Page 2: ...the filled tank Wagner Solar cannot be held liable for damages resulting from improper use 2 Scope of supply The ECOplus solar cylinder is supplied standing upright and screwed onto a pallet The serial no is located on the type label Table 1 Scope of supply fig 2 1 Storage 2 Jacket insulation with hook ratchet closure may be several parts depending on storage type 3 Insulation plug with cap for ac...

Page 3: ...EN XXX_ECOplus Solar Storage_MA 201026 1WA10603 3 Figure 2 Scope of supply Figure 3 Tilt the storage to insert the inner floor insulation 2 4 8 7 1 6 5 2 3 ...

Page 4: ...s heated to its maximum tem perature the DHW temperature set at the thermostatic mixing valve will not be exceeded If no thermostatic mixer is fitted maximum vessel temperature must be limited to 65 C at the solar controller Serious danger of scalding Thesolarinstallationmayheatthestoragewatertotem peratures of up to 95 C The installation of a thermostatic mixing valve limits the tap temperatures ...

Page 5: ...available that can be installed in the 1 socket on the side fig 6 Please observe instructions supplied with the respec tive heating device Laying the mains cable of the electrical heater a heat resistant cable min up to 95 C must be used when laying the cable under the insulation jacket The immersion heater must only be connected to mains after the storage tank is filled If no immersion heater is ...

Page 6: ...allation Malfunction or damage when storage tank is not ade quately purged In spite of careful production methods some residues of the processes including metal slack may remain inside the pipes the vessel and the heat exchangers These can cause problems during operation of the system and may lead to damage Therefore the system must be flushed before permanent operation starts Also filtering retai...

Page 7: ...ar cylinder 1 Now set the insulation jacket to the connection side around the connection openings and if in place the immersion heater 2 First lock the ratchet closure into the loosest position and then tighten from the top alternating if the jacket has more than one closure until the jacket tightly fits the storage tank 3 If no immersion heater is fitted insert insulation plug with cap 4 Insert i...

Page 8: ... in uninsulated sacrificial magne sium anode examine remaining magnesium mass and if necessary install new anode Forsacrificialanodeswithinsulatedinstallation MGan odes test the protective current between storage and anode fig 13 When the value is below 0 3 mA remove and examine the anode and replace if required If an impressed current anode is installed observe the related product documentation A...

Reviews: