Page 1: ...Manual Plotter IP 350...

Page 2: ...upply 4 3 Product overview 5 4 Setting up the Vario Plotter IP 350 6 4 1 Location 6 4 2 Connections 6 5 Operation 7 6 Cleaning and product care 10 7 Accessories 11 8 Troubleshooting 13 9 Technical Inf...

Page 3: ...r pen seal The pens can be stored in the plotter s pen station Auto calibration no adjustment necessary Capable of labelling marking elements up to 10 5 mm in height Special solutions for up to 15 mm...

Page 4: ...ee list below Please retain the packaging in case you need to return the device The following items are supplied as standard 1 WAGO Plotter IP 350 2 Power supply with corresponding mains power cable 3...

Page 5: ...rea 5 Pin stops for holding plates 6 Vacuum supply of the individual segments 7 Penholder pen receptacle 8 Lowering unit 9 Vacuum connection point 10 Mains connection 11 Gate terminal for external dev...

Page 6: ...ove freely and is not obstructed by other objects 4 2 Connections Plug the device into a correctly installed mains socket using the power supply included with the product The power supply features a v...

Page 7: ...to activate and deactivate the device When the plotter is switched on the writing arm moves to the top right hand corner of the labelling area and auto calibration takes place The green indicating lig...

Page 8: ...nd corner after the pen has been deposited The red light will signal the interruption Pressing the key again will calibrate the writing arm and the plotter will continue with the job The red lamp will...

Page 9: ...g the elements in the holding plates Choose the appropriate holding plate for the elements to be labelled and carefully insert the elements into the holding plates To insert the elements remove the ho...

Page 10: ...ver is supplied as accessory Wipe the device occasionally after use with a dry lint free cloth or a mild cleaning agent If the pen station storage holders are heavily soiled please replace them IMPORT...

Page 11: ...O ink cartridges 258 141 WAGO service kit 258 147 Dust cover 258 146 EXCHANGING SEALING UNIT IN THE PEN STATION REMOVING A SEALING UNIT FROM THE PEN STATION First open the pen station by pressing the...

Page 12: ...adjust the sealing unit using the key until the key is parallel with the plotter surface The opening at the side of the sealing unit should now be centered EXCHANGING THE PRIMING PLATES for starting t...

Page 13: ...s not respond to data downloaded from PC Is the interface cable connected properly Replace the data cable if necessary Is the correct interface on the PC being used No labelling is taking place even t...

Page 14: ...eat accuracy after pen change 0 05 mm with optimum pen Power supply Separate power supply with exchangeable mains power connection Power supply input voltage Power supply input current 100 240V AC 50...

Page 15: ...ds and all applicable safety regulations The mains power supply used must correspond with that specified on the name plate Use in dry conditions only Disconnect the device from the mains socket by pul...

Page 16: ...a e 27 D 32423 Minden Phone 49 571 887 0 Fax 49 571 887 169 info wago com www wago com Support Hotline ProServe Phone 49 571 887 630 Fax 49 571 887 8630 support proserve wago com 0888 0415 0300 3601 M...

Reviews:

Related manuals for IP 350