background image

 

INSTALLATION INSTRUCTIONS 

Boiling Billy JE, JR Series

 

DO NOT PLUG IN OR TURN ON 

POWER 

 

1.

 

Fit tap and shank on the outlet connection 
provided. 

2.

 

Mount unit on the wall using fixing points on 
the back of the unit. It is advisable to 

position the tap outlet over a drain board so 

that in the event of a leaking tap the water 

can be disposed via the sink. 

3.

 

Connect cold water supply to the inlet 

(12mm) through a stop tap in the supply 

line. (stop tap to be provided by the 

installer)(. We recommend the fitting of a 
350kpa PLV. 

4.

 

Connect overflow pipe to waste or any other 

area where water can be disposed in a safe 

manner.( Tundish should be fitted) 

5.

 

* Plug unit into 10 amp power outlet. 

6.

 

Turn ‘on’ water supply to the unit and ‘open’ 

the outlet tap. 

7.

 

Wait until the water flows out of the tap. 

8.

 

When the water flows out of the tap please 
switch on the power. 
 

*3.0kw element requires a 15amp power outlet. 

 

 

 
 

 

 

 

 

 

 

 

INSTALLATION INSTRUCTIONS 

JE SERIES 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

Reviews: