background image

 

 

 

The Wattwatchers A6M+One can be used for power purchase

agreements (PPAs), other off-market billing, large-scale generation

certificates (LGCs), meeting NABERS and Green Star requirements,

and more...

https://service.wattwatchers.com.au/a6mone-comprehensive-
installation-guide

For the full A6M+One comprehensive installation guide, scan the QR
code or go to:

© 2023 Wattwatchers Pty Ltd ABN 47 123 010 588                      v2.0     Page 1/14 

A6M+ONE

INSTALLATION GUIDE

Summary of Contents for A6M+One

Page 1: ...tion certificates LGCs meeting NABERS and Green Star requirements and more https service wattwatchers com au a6mone comprehensive installation guide For the full A6M One comprehensive installation gui...

Page 2: ...RDING How to use Onboarding How to read the Modbus tab in Onboarding SUPPORT Troubleshooting FAQs How to contact support 4 4 4 5 A6M ONE WIRING DIAGRAMS What PMC meter do you have Wiring diagrams for...

Page 3: ...as required by the laws of the relevant state or country The installer must possess comprehensive knowledge of applicable standards and directives within the jurisdiction where the device is being ins...

Page 4: ...s 60A to 600A available A6M One CET PMC METER 3x billing CTs for the PMC 330 BB 600A or 1500A available Modbus 4G via cloud Three CET models available 1x 4G stubby antenna 1x Green plug for power for...

Page 5: ...s per phase NMI M6 Pattern Approved DIN mountable Fits cables up to 80mm diameter Three phase PMC For circuits up to 1500A per phase via CT connection PMC 220 PMC 340 BA PMC 340 BB Up to 63A direct co...

Page 6: ...to the site See the HOW TO USE ONBOARDING page for more info TAKE SPARE PARTS Take a spare A6M One pack if you have one and an external high gain antenna LABEL THE CTS ON BOTH ENDS Label all the CTs o...

Page 7: ...eady have an account Great But remember to ask the fleet manager if you are added to their account as an installer so you can onboard their devices Scan the QR Code below or use the link to watch our...

Page 8: ...uts of the A6M Power factor PF should always be in a positive state and not show a negative sign You want to see a good range between 0 8 and 1 0 when sufficient load is present 0 8 1 0 The Start Chan...

Page 9: ...green plug is seated correctly and power cycle the device L3 OFF OR L3 FLASHING This indicates that the Auditor has poor no signal Improve signal by installing a high gain 4G antenna Contact Support t...

Page 10: ...Wiring diagrams are intended to be used as a guide only 2023 Wattwatchers Pty Ltd ABN 47 123 010 588 v2 0 Page 10 14 A6M ONE WIRING DIAGRAMS...

Page 11: ...3 and 4 are all present PMC 340 BA Direct connection Page 13 PMC 340 BB CT connection Page 14 PMC 220 Single phase Page 12 1 PHASE DIRECT CONNECT WHICH PMC METER DO YOU HAVE Before finding your wirin...

Page 12: ...ing Mains and Load PMC is monitoring Load PMC 220 Single Phase Auditor is monitoring Mains and Solar PMC is monitoring Solar 2023 Wattwatchers Pty Ltd ABN 47 123 010 588 v2 0 Page 12 14 PMC 220 A6M ON...

Page 13: ...ditor is monitoring Grid and Solar PMC is monitoring Solar Auditor is monitoring Grid and Load PMC is monitoring Load any type of load 2023 Wattwatchers Pty Ltd ABN 47 123 010 588 v2 0 Page 13 14 PMC...

Page 14: ...uits being monitored when working with the billing CTs PMC 340 BB CT connection Auditor is monitoring Grid and Load PMC is monitoring Load any type of load Auditor is monitoring Grid and Solar PMC is...