Installation and Startup Guide

 

This document covers the installation of MT8121/8150XE Series HMI, for the detailed specifications 
and operation, please refer to Brochure and EasyBuilder Pro User Manual. 

Install Environment: 

NEMA Rating

 

The 

MT8121/8150XE

 Series HMI is NEMA 4 rated (Indoor Use Only). 

 

Electrical 
Environment

 

The 

MT8121/8150XE

 Series has been tested to conform to European CE 

requirements. This means that the circuitry is designed to resist the effects of 
electrical noise. This does not guarantee noise immunity in severe cases. Proper 
wire routing and grounding will insure proper operation.

 

Environmental 
Considerations

 

(1)  Make sure that the displays are installed correctly and that the operating 

limits are followed. Avoid installing units in environments where severe 
mechanical v bration or shocks are present. 

(2) 

Do not operate the unit in areas subject to explosion hazards due to 
flammable gases, vapors or dusts.

 

(3)  Do not install the unit where acid gas, such as SO2 exists. 

(4) 

This device should be mounted in the vertical position and for use on the flat 
surface enclosure.

 

(5) 

Conform to UL508 (ISBN 0-7629-0404-6) machine safety for use in 
Pollution Degree 2 Environment.

 

 

Unpacking the Unit

 

Unpack and check the delivery. If damage is found,   
notify the supplier.   

Installation Instructions 

Secure the operator panel in position, using all the fastening holes and the provided brackets   
and screws: 
 

 

 

 

Type 

A(mm) 

B(mm) 

MT8121XE 

305 

231 

MT8150XE 

352 

279 

 

Power Connections 

 

System Settings 

When HMI is powered up and displays image,   
press the system setting button. 
(Default System Password: 111111) 

It is necessary

 to connect the HMI to   

your network through a RJ-45 cable. 
 
 
 
 
 
 
 
 
 
 
 
 

 

MT8121/8150XE series 

                                                                                                               

Installation Instruction 

 

NOTE:   

Place the operator panel on a stable 

surface during installation. Dropping it or 

letting it fall may cause damage. 

 

Go to the Network tab, you may choose 
to auto get DHCP IP, or designate your 
own IP.

 

NOTE:   

1. 

Connect p

ositive DC line to the „+‟ terminal 

and the DC 

ground to the „-‟ terminal. 

 

2. Please do not connect HMI with PLC and PC 
simultaneously to prevent potential difference 
from destroying USB ports of HMI and PC. 
 
 

(A) 

(B) 

Cutout 

(1) 

 

(2) 

 

 

 

(5) 

(4) 

(3) 

 

(1) Installation Instruction, 2-sided A4 *1 

(2) Human Machine Interface *1

 

(3) Power Connector *1

 

(4) Brackets & Screws *1 pack

 

(5) Fuse 1.6A/250V 5*20mm *1

 