background image

 Equipment Issue A

030-101639 Rev. B, February 2008

Section VES-R00-20A

R

E

Copyright 2008 

E

Westell, Inc. All rights reserved. Westell

r

 is a registered trademark and VirtualEdge

t

 is a trademark of Westell, Inc.

Page 1 of 10

0802IARB

VirtualEdge

t

 SwingRack Wall-mount 19/23" Equipment Rack

(Models VESR-00 and VESR-14)

CONTENTS

PAGE #

1. GENERAL

1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

2. FEATURES AND OPTIONS

3

. . . . . . . . . . . . . . . . . . . . . 

3. INSTALLATION

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

4. CUSTOMER & TECHNICAL SERVICES 

10

. . . . . . . . 

5. WARRANTY & REPAIRS

10

. . . . . . . . . . . . . . . . . . . . . . 

6. SPECIFICATIONS

10

. . . . . . . . . . . . . . . . . . . . . . . . . . . . 

1.

GENERAL

1.1

Document Purpose

This practice describes Westell’s VirtualEdge

t

 SwingRack

(VESR) series of wall-mountable 19/23" equipment racks. A
typical SwingRack is shown in Figure 1.

- NOTE -

Hereafter, Westell’s VirtualEdge SwingRack wall-mount equip-
ment racks may be commonly referred to as the SwingRack."
Specific model numbers will be used where differences apply.

1.2

Document Status

Whenever this practice is updated, the reason will be stated in
this paragraph. Revision B updates Step 8 of Paragraph 3.4 and
removes references to the VESR-04 and VESR-10 models.

1.3

Product Purpose and Description

The Westell VESR-XX series of wall-mount SwingRacks of-
fers a sturdy yet light-weight and space-saving solution for
mounting equipment originally designed for 19" or 23" rack
mounting on a wall. Wall-mounting one or two Rack Unit (RU)
high equipment in the SwingRack saves valuable rack space for
other equipment, makes use of previously-vacant wall space,
and facilitates installation, maintenance, and testing proce-
dures by rotating the attached equipment down to a
comfortable, easy-access, horizontal height. The key feature of
the SwingRack is the matching set of 90

_

 rotating arms (rails)

which imitate and duplicate the width between the rails of a
standard 23" equipment rack. The arms, one on each side of the
SwingRack, have two positions; up or down. The down position
is used for initial equipment installation or future maintenance
and testing. The up, space-saving, locked position is used after
initial installation is complete and the mounted equipment is
placed in service. Spring-loaded latch-release knobs on the
front of each arm slide inward to free the slam-bolt latch from
the latch holes in the side walls of the SwingRack. Included are
easy-mount adapter ears which allow mounting of equipment
designed for 19" racks. Originally designed for switches and
routers, the SwingRack easily accommodates any equipment

Figure 1.

Closed Front View of VESR-00 SwingRack

Figure 2.

Opened Isometric View of VESR-14

which fits the standard 19" or 23" rack-mounting width and
which is either one or two RUs high.

1.4

Product Mounting

Westell’s VESR-XX series are designed for wall-mounting on
any wall with wood studs on 16" centers, on a concrete wall, or
on any company-approved equipment backboard, at the cus-

Summary of Contents for VirtualEdge VESR-00

Page 1: ... Unit RU high equipment in the SwingRack saves valuable rack space for other equipment makes use of previously vacant wall space and facilitates installation maintenance and testing proce dures by rotating the attached equipment down to a comfortable easy access horizontal height The key feature of the SwingRack is the matching set of 90_ rotating arms rails which imitate and duplicate the width b...

Page 2: ...nagement and protection S Spring loaded slam bolt latches one in each arm securely lock the SwingRack s arms in the up position S Holes and slots strategically placed for cable tie downs S Sturdy but light weight material steel back plate and alumi num swing arms and support plate S Ground lug accepts 6 AWG ground wire S Flexible heavy duty ground strap VESR 00 model only S Two external 3 D rings ...

Page 3: ...mmon to all models in the series 2 1 1 Construction Design and Material The one piece SwingRack takes advantage of the available and vacant wall space in crowded equipment rooms so 1 or 2 RU high equipment that typically is mounted in 19 or 23 equipment racks can be mounted on a wall leaving valuable rack space for taller equipment or additional equipment Each SwingRack model consists of a durable...

Page 4: ... posi tion if desired The rings are made of a flexible aluminum and are designed with an angled cut or slit on the outer edge to facil itate cable routing ingress and egress into and out from the internal confines of the D ring Simply press on the top or bot tom half of the D ring and route the cables through the provided gap in the D ring 2 1 4 2 Slam bolt Latch When the swing arms are in the up ...

Page 5: ...ing it off place the rear wall of the race way against the adapter ears align the holes then attach the race way to the ears with the provided hardware Route cables through the race way to the slotted hole or tab closest to the equipment s desired connec tor and press on the race way slot s flexible tab to create space to enable the cable to enter the slotted hole When all cables are connected or ...

Page 6: ...tween any multiple installations or other equipment The distance from the cable entry point should be consistent with local installation practices Figure 6 Corner Mounting Hole Locations and Dimen sions VESR XX Front View Open Position Adapter ears installed at end of open arms Self leveling center keyhole for drywall walls center between 16 studs See Table 2 for more dimensions CAUTION When using...

Page 7: ...date the mounting screws bolts or fas teners being used hardware not included at the marked locations Do not drill holes too big to ensure a snug fit 8 Partially install all screws Partially install all screws bolts or fasteners leaving approximately inch protruding from which to hang the unit via the unit s keyhole shaped holes When mounting on a wood backboard use 10 or greater steel pan head wo...

Page 8: ...U is available attach the D rings to the center set of holes in the installed adapter ears first mount the adapter ears to the swing arms then mount the D rings to the ears using the provided hardware 5 Install race way slotted duct if applicable For the VESR 14 model only if desired and if one RU is avail able the provided cable race way can be installed at this time in the top RU position for ca...

Page 9: ...the lock and turn the key clockwise to rotate the lock s tab into the slot pro vided for it in back plate s top flange 3 5 2 Mounting 19 Equipment If the equipment to be mounted on the SwingRack was de signed for 19 rack mounting first install the provided adapter ears onto the ends of each swing down arm before attaching the equipment to the arms Follow the steps below 1 Place arms in down positi...

Page 10: ...y calling or using one of the options shown below Once an RMA number is obtained return the defective unit freight prepaid along with a brief problem description to the address we will provide to you when you contact us Voice 630 375 4211 email rgmdept westell com Replacements will be shipped in the fastest manner consistent with the urgency of the situation Westell will continue to repair or repl...

Reviews: