background image

05/29/2018 
           1/2E

If light doesn’t turn on, check the 
battery to ensure that it is making 
secure contact with the terminals. 
If this doesn’t work, replace with a 
new battery.

Tools Required

Screwdriver

Pencil

Electric drill 
drill bit size: 
ø7.5mm (3/10 in.) 

Mark the location where you want to mount the light. 

Drill two holes.

Marking the location

Measure the width of two holes on the back of the solar fence 
light to align holes for 2 the screws (A) on the surface. The 
distance between the two holes is 96mm. 

  

Fixing the screws

Insert the screws (A) and leave at least 1/4 in., or 5 mm of the 
screws (A) outside of the surface for holding the solar fence light.  

Insert the plastic plugs (B) so they are flush with the surface.

REPLACING THE BATTERY

TROUBLE SHOOTING

FOR FIRST TIME USE: SOLAR LIGHT NEEDS TO CHARGE IN FULL SUNLIGHT FOR 8 -12 HOURS WITH THE SWITCH IN 
THE “ON” POSITION TO ALLOW THE  RECHARGEABLE BATTERIES TO REACH MAXIMUM CAPACITY. 
IF INSTALLING MORE THAN 1 LIGHT, YOU MUST LINK YOUR LIGHTS FIRST, BEFORE INSTALLATION BEGINS. YOU MAY 
LINK UP TO 6 LIGHTS. AFTER THE LIGHTS ARE LINKED YOU MAY BEGIN THE INSTALLATION PROCESS.  

INSTALLATION 

INSTRUCTIONS

Hardware Included

Plastic plug X 2 

Screw X 2

Part

Light Fixture X 1

A

B

C

ITEM: Q08BN0301-08

Mounting the light

Mount the light on the screws (A) by placing the keyholes 
on the back of the light over the screw heads. 

x

x

96mm

B

A

Slide the power switch to the "OFF" position. Use a 
Phillips head screwdriver to remove the 4 screws 
holding the battery cover in place. Gently pull battery 
pack away from the light fixture and disconnect the 
battery connector. Replace old battery pack with a 
new 6V AA Ni-Mh 900mAh rechargeable battery pack. 
Connect the battery connector and insert battery pack 
into the light fixture. Replace the battery cover by 
aligning it properly and replacing the 4 screws 
removed earlier. Slide the power switch to the  “ON” 
position.  

For optimum performance, allow solar light to charge 

in full sunlight.

A

Screws

Battery cover

Battery pack

Battery 
connector

ON/OFF Switch

Link ON Switch

Summary of Contents for Q08BN0301-08

Page 1: ...MUM CAPACITY IF INSTALLING MORE THAN 1 LIGHT YOU MUST LINK YOUR LIGHTS FIRST BEFORE INSTALLATION BEGINS YOU MAY LINK UP TO 6 LIGHTS AFTER THE LIGHTS ARE LINKED YOU MAY BEGIN THE INSTALLATION PROCESS INSTALLATION INSTRUCTIONS Hardware Included Plastic plug X 2 Screw X 2 Part Light Fixture X 1 A B C ITEM Q08BN0301 08 3 Mounting the light Mount the light on the screws A by placing the keyholes on the...

Page 2: ... tornillos A en la superficie La distancia entre los orificios es de 96mm 3 Cómo montar la lámpara Monta la lámpara en los tornillos A al colocarlos orificios de la parte posterior de la lámpara en las cabezas de los tornillos x x 96mm 2 Cómo fijar los tornillos Inserta los tornillos A y deja al menos 5 o 6 mmde los tornillos A afuera de la superficie para sostener la lámpara solar para cerca Inse...

Page 3: ...l codes to the Child lights 5 Once the Child lights receive and save the matching signal the blinking light on the Child lights will stop flashing this confirms the code matching is completed 6 When all Child lights are matched successfully move back the link on button for Parent light The code matching is finished and products are Linked When any of the lights are triggered by the Motion Detector...

Page 4: ...incronización a las luces secundarias 5 Una vez que la luz secundaria se ilumina recibe y guarda la señal de sincronización la luz parpadeante de las luces secundarias dejará de parpadear esto confirma que se completó la sincronización del código 6 Cuando todas las luces secundarias se combinen correctamente gire hacia atrás el botón de acoplamiento para la luz principal La sincronización de códig...

Reviews: