background image

UK/IE

OPERATING INSTRUCTIONS FOR THE USER

HYBRID SYSTEM WITH AIR TO WATER HEAT PUMP

GREENSTAR PLUS HYBRID

6720803687-00.1Wo

FOR COMBINATION WITH WORCESTER APPLIANCES THAT HAVE A CENTRAL HEATING 
OUTPUT UP TO 28kW

6 72

0 803 688 (2012/11)

Summary of Contents for GREENSTAR PLUS

Page 1: ...NSTRUCTIONS FOR THE USER HYBRID SYSTEM WITH AIR TO WATER HEAT PUMP GREENSTAR PLUS HYBRID 6720803687 00 1Wo FOR COMBINATION WITH WORCESTER APPLIANCES THAT HAVE A CENTRAL HEATING OUTPUT UP TO 28kW 6 720...

Page 2: ...liance 3 2 1 Designated use 3 2 2 EU Declaration of Conformity 3 2 3 Data plate 4 2 4 General information on heat production 4 2 5 Overview of components 5 2 5 1 Greenstar plus hybrid manager internal...

Page 3: ...nstalled by a competent person Modification for any other use is forbidden Never close the outlets of any safety valves COMMISSIONING Thehybridsystemandthecomponentsmayonlybecommissionedby a competent...

Page 4: ...echnologies in one system and thereby offersthe opportunity to use either heat source optimally at any time Users can decide for themselves whether the emphasis should be on primary energy consumption...

Page 5: ...nager 1 Refrigerant lines for the refrigerant R410A 2 Casing 3 Water pipe connections 2 5 2 GREENSTAR PLUS EXTERNAL UNIT Fig 3 Main components and casing of external unit 4 Top casing panel 5 Service...

Page 6: ...regulated by means of the weather compensated FW200 programming unit 9 12h 15 18 21 24h 3 6 6 720 613 572 01 1O 3 3 4 1 menu info 1 2 3 5 6 7 8 4 Keyboards 1 Turning the selector in direction Selects...

Page 7: ...e heating circuit to now Activate DHW heating immediately The DHW cylinder is heatedto the requiredtemperature for 60minutes or with combi boilers comfort mode is activated for 30 minutes If the ECO b...

Page 8: ...erature CO2 cost mix 4 5 3 MAIN MENU ENERGY PRICE RATIO Thismenuoptionisonlyavailableifthecontrolstrategyhasbeensetto cost optimised or CO2 cost Mix at contractor level Operation Display Open flap The...

Page 9: ...NTENANCE So that gas consumption and environmental impact can be kept as low as possible for as long as possible we recommend that you take out an inspection and maintenance contract with an authorise...

Page 10: ...nst faulty materials or workmanship for a period of two years from the date of installation subject to the following terms and conditions During the period of this guarantee any components of the appl...

Page 11: ...a large proportion of the energy they deliver fromtheenvironment Thisportionofenergyisnotdescribedas supplied energy as it is free of charge Were the efficiency under these conditionstobecalculated i...

Page 12: ...Worcester Bosch Group is a brand name of Bosch Thermotechnology Ltd worcester bosch co uk 6 720 803 688 2012 11 WORCESTER BOSCH GROUP TECHNICAL SUPPORT 0844 892 3366 APPOINTMENTS 0844 892 3000 SPARES...

Reviews: