background image

2.03m (6.6 ft) x 2.38m (7.8 ft)         

CEDAR POLY GREENHOUSE

 

Installation and Operating Instructions – YM12842

07-08-2021

Y40000-842

7’ 10-5/16”

2.395 m

Patents Pending

Yardistry – North America

Toll Free Customer Support: 

1.888.509.4382

info@yardistrystructures.com

www.yardistrystructures.com

Regular Hours:  Mon - Fri, 8:30 am - 5:00 

pm EST (excl. holidays)

(For extended hours see our website)                   

English and French Spoken

HEIGHT:

2.36m / 7’ 9”

 IMPORTANT, RETAIN FOR FUTURE REFERENCE: READ CAREFULLY

YM12842 -   6.6' x 7.8'

Cedar Poly Greenhouse 

7'10 5/16"

2.395

 m

6'8 11/16"

2.049

 m

6’ 8-11/16”

2.049 m

Summary of Contents for YM12842

Page 1: ...oll Free Customer Support 1 888 509 4382 info yardistrystructures com www yardistrystructures com Regular Hours Mon Fri 8 30 am 5 00 pm EST excl holidays For extended hours see our website English and...

Page 2: ...sible sharp edges of individual elements before assembly During installation follow all safety warnings provided with your tools and use OSHA approved safety glasses Some structures may require two or...

Page 3: ...e is required to assure the integrity of your product and is a requirement of the warranty This warranty does not cover any inspection costs This Limited Warranty does not cover Labour for replacement...

Page 4: ...t or stain water based on a yearly basis is important maintenance to maintain maximum life and performance of the product Check all wood members for deterioration structural damage and splintering San...

Page 5: ...ore and after assembly as it can bend dent and scratch easily When standing on the outside of the unit the notch in the poly carbonate panel needs to be on the bottom right hand side Remove protective...

Page 6: ...ves when using product KEEP OUT OF REACH OF CHILDREN Prolonged or repeated exposure MAY CAUSE ORGAN DAMAGE Provide ample ventilation FIRST AID If ingested DO NOT INDUCE VOMITING Seek immediate medical...

Page 7: ...e Use the following dimensions for the concrete foundation Structure Location Preparation Preparing the Location for your Structure replaces Permanent Installation Examples Note It is critically impor...

Page 8: ...arts for Y50229 1108 Left Post FSC 66 7 x 76 2 x 1835 2mm 72 1 4 2pc 1108 Y50229 1109 Right Post FSC 66 7 x 76 2 x 1835 2mm 72 1 4 2pc 1109 Y50229 1111 Left Door Post FSC 38 1 x 66 7 x 1974 9mm 77 3 4...

Page 9: ...n the identification of parts for Y50229 1113 Back Post FSC 76 2 x 66 7 x 1974 9mm 77 3 4 2pc 1113 1pc 1120 Back Base FSC 38 1 x 66 7 x 1905mm 75 Y50229 1120 Y50229 1117 Back Gable Beam FSC 66 7 x 76...

Page 10: ...the identification of parts for Y50229 1110 Mid Post FSC 66 7 x 76 2 x 1835 2mm 72 1 4 2pc 1110 Y50229 1118 Side Base FSC 38 1 x 76 2 x 2190 8mm 86 1 4 2pc 1118 Y50229 1107 Side Wall Sill FSC 38 1 x...

Page 11: ...r FSC 7 x 63 5 x 262mm 10 5 16 2pc 1188 Y50229 1126 Inside Vent Block FSC 25 4 x 44 5 x 328mm 12 15 16 2pc 1126 Y50229 1127 Vent Roof Rafter FSC 66 7 x 76 2 x 692 2mm 27 1 4 1pc 1127 Y50229 1128 Botto...

Page 12: ...imensions are approximate and are shown to assist in the identification of parts for assembly Actual dimensions may be smaller or larger 8pc 1138 Wooden Gusset FSC 34 9 x 139 7 x 203 2mm 8 Y50229 1138...

Page 13: ...800 429 Back Centre Panel Y61800 429 1pc Y61800 430 Y70800 430 Gable Panel 1pc 2PK 8mm Bolt Y00418 451 Y70818 440 1pc Sliding Barrel Bolt Black PAD Y00418 450 Y00418 452 Ear Y00600 457 Chain 1pc Door...

Page 14: ...sembly Actual dimensions may be smaller or larger 43pc Wood Screw 8 x 2 1 2 Y06091 522 1pc 1 8 Drill Bit Y00400 002 47pc Pan Screw 10 x 1 1 4 Y06491 711 91pc Wood Screw 8 x 3 Y06091 530 88pc Wood Scre...

Page 15: ...locations prior to excavating any holes D Before you discard your cartons fill out the form below The carton I D stamp is located on the end of each carton Please retain this information for future r...

Page 16: ...before installing tape to prevent damage to the panels IMPORTANT POLYCARBONATE INFORMATION STOP PAGE IMPORTANT Polycarbonate Each Polycarbonate panel has a UV coating on only ONE side of t To install...

Page 17: ...e around the edges and rub gently to avoid damaging the tape To install properly so the UV coating is on the outside of the panel orientated to the bottom right hand corner of the assembly Photo of PC...

Page 18: ...post Make sure grooves in posts are facing inwards and to the back Posts are flush to the ends of 1119 Front Base F2 1 F2 2 and F2 3 F2 1 F2 2 1109 Right Post 1108 Left Post Top Bottom 1119 Front Bas...

Page 19: ...o they rest tight to the top of the 1119 Front Base F2 4 C Place one 1111 Left Door Post and one 1112 Right Door Post tight to each 1147 FB Panel then attach to 1119 Front Base with two 8 x 3 Wood Scr...

Page 20: ...1147 FB Panel with one 8 x 3 Wood Screw per post F2 6 and F2 7 E Attach 1119 Front Base to 1147 FB Panels with three 8 x 3 Wood Screws per panel F2 6 and F2 8 F2 6 Hardware 8 x 8 x 3 Wood Screw 1147...

Page 21: ...Panels F Attach 1108 Left Post and 1109 Right Post to top and bottom of 1147 FB Panel with two 10 x 4 Wood Screws per post F2 9 F2 9 Hardware 4 x 10 x 4 Wood Screw 1147 FB Panel 1108 Left Post 1109 R...

Page 22: ...and 1105 Front Wall Sill to line up Posts with Door Posts Attach 1105 Front Wall Sills to 1147 FB Panels with two 8 x 3 Wood Screws per panel Remove 1188 Guide Spacers F2 10 F2 11 and F2 12 F2 10 Hard...

Page 23: ...e panel The UV coated side must be to the outside of the frame F2 13 and F2 14 Components 1 x Left FB Side Panel 1 x Right FB Side Panel Top Tape Bottom Tape Slide Polycarbonate Panel down and along t...

Page 24: ...ver the posts then attach with two 10 x 4 Wood Screws per post F2 15 and F2 16 10 x 4 Wood Screws Connects the Front Gable Beam to the Left and Right Door Posts F2 15 Hardware 4 x 10 x 4 Wood Screw 10...

Page 25: ...d F2 19 FOR SEPARATION OF UPRIGHTS INSIDE AND OUT 10 x 4 Wood Screws MAKE SURE TO USE GUIDE SPACER FOR SEPARATION OF UPRIGHTS INSIDE AND OUT Wood Parts 1 x 1121 Upright Inside 1 x 1122 Upright Outside...

Page 26: ...own into the grooves of 1143 Front Gable Beam in between 1121 Upright Inside and 1122 Upright Outside Make sure the notch at the bottom is on the right side of the panel The UV coated side must be to...

Page 27: ...S T E P A 0 x 5 5 8 W o o d S c r e w C o n n e c t s t h e L T R T R a f t e r s t o t h e L T R T P o s t s S T E P B 0 x 4 W o o d S c r e w C o n n e c t s t h e L T R T R a f t e r s t o t h e F...

Page 28: ...t Make sure grooves in posts are facing inwards and to the back Posts are flush to the ends of 1120 Back Base F3 1 F3 2 and F3 3 F3 1 F3 2 1109 Right Post 1108 Left Post Top Bottom 1120 Back Base Wood...

Page 29: ...e one 1113 Back Post tight to each 1147 FB Panel then attach to 1120 Back Base with two 10 x 4 Wood Screws per post F3 4 and F3 5 10 x 4 Wood Screw Tight Hardware 4 x 10 x 4 Wood Screw Wood Parts 2 x...

Page 30: ...Screw per post F3 6 and F3 7 E Attach 1120 Back Base to 1147 FB Panels with three 8 x 3 Wood Screws per panel F3 6 and F3 7 F3 6 Hardware 6 x 10 x 4 Wood Screw 6 x 8 x 3 Wood Screw 1147 FB Panel 1113...

Page 31: ...ight to the top of the 1120 Back Base Vent should be closer to the 1120 Back Base F3 8 and F3 9 Step 3 Back Wall Assembly Part 4 Wood Parts 1 x 1155 Vent Wall Panel F3 8 1113 Back Post F3 9 1155 Vent...

Page 32: ...x 3 Wood Screws per panel Remove 1188 Guide Spacers F3 10 F3 11 and F3 13 Hardware 9 x 8 x 3 Wood Screw Wood Parts 1 x 1106 Back Wall Sill 1188 Guide Spacer 1106 Back Wall Sill 1147 FB Panel Guide Spa...

Page 33: ...k Posts slide Back Centre Panel down so it fits in the grooves of 1106 Back Wall Sill Make sure the notch at the bottom is always on the right side of the panel The UV coated side must be to the outsi...

Page 34: ...uide Spacer in the grooves of 1117 Back Gable Beam and one at the top of the uprights for proper spacing of Uprights Attach Beam to Uprights with one 10 x 4 Wood Screw per upright Remove 1188 Guide Sp...

Page 35: ...13 Back Posts so notches on the bottom fit over the posts then attach with two 10 x 4 Wood Screws per post F3 17 and F3 18 Hardware 4 x 10 x 4 Wood Screw 10 x 4 Wood Screw 1113 Back Post CONNECT THE G...

Page 36: ...ble Panel down into the grooves of 1117 Back Gable Beam in between 1121 Upright Inside and 1122 Upright Outside Make sure the notch at the bottom is on the right side of the panel The UV coated side m...

Page 37: ...is on the outside of the assembly Attach rafters to posts with one 10 x 5 5 8 Wood Screw per post and to 1117 Back Gable Beam with one 10 x 4 Wood Screw per rafter F3 22 and F3 23 P Attach each rafte...

Page 38: ...t Trims around opening in 1155 Vent Wall Panel using two 8 x 2 1 2 Wood Screws per trim F3 25 and F3 26 VENT WALL PANEL Wood Parts 4 x 1136 Inside Vent Trim Hardware 8 x 8 x 2 1 2 Wood Screw 8 x 2 1 2...

Page 39: ...the an top end ang Hardware Step 4 Side Wall Assembly Part 1 A At the bottom of one 1110 Mid Post attach one 1118 Side Base with two 10 x 4 Wood Screws Make sure grooves in posts are facing the sides...

Page 40: ...2 Side Wall Panel attach 1110 Mid Post to each panel with two 10 x 1 1 4 Pan Screws per bracket F4 4 and F4 7 D Repeat Steps A C for a second Side Wall Assembly Hardware 16 x 8 x 3 Wood Screw 8 x 10 x...

Page 41: ...blies with two 10 x 4 Wood Screws per side F5 1 F5 2 and F5 3 Slide the tongue from the SIDE WALL into the groove of the BACK POST Rest BACK WALL ASSEMBLY on the 4 x 4 Frame prior to sliding into SIDE...

Page 42: ...ll Assemblies Part 2 B With a helper stand up Front Wall Assembly and slide so Side Wall Assemblies fit into grooves of 1108 Left Post and 1109 Right Post Pre drill with a 1 8 drill bit then attach Fr...

Page 43: ...e of one post to the inside of the opposite post is 9 2 7 16 2 806 m F6 1 F6 1 Side Wall Assembly Back Wall Assembly Front Wall Assembly Side Wall Assembly 7 7 1 2 2 324 m Outside Post to Outside Post...

Page 44: ...osts Attach 1107 Side Wall Sills to 1152 Side Wall Panels with three 8 x 3 Wood Screws per panel Remove 1188 Guide Spacer F7 1 and F7 2 Hardware 12 x 8 x 3 Wood Screw 1107 Side Wall Sill Wood Parts 4...

Page 45: ...Screw Components 4 x Corner Bracket A On the inside of the assembly using one Corner Bracket per corner connect 1119 Front Base and 1120 Back Base to 1118 Side Bases with two 10 x 1 1 4 Pan Screws per...

Page 46: ...g one Corner Bracket per corner connect each 1108 Left Post 1109 Right Post and 1110 Mid Post to each 1107 Side Wall Sill with two 10 x 1 1 4 Pan Screws per bracket F8 3 F8 4 and F8 5 1110 Mid Post 11...

Page 47: ...drill then secure the Front Wall Back Wall and Side Walls to the base in the locations shown in F9 1 8 x 3 Wood Screws x14 Connects FRONT WALL BACK AND SIDE WALLS to the 4 x 4 base Pre drill prior to...

Page 48: ...10 Mid Post with one 8 x 2 Wood Screw per post F10 1 and F10 4 1109 Right Post 1108 Left Post Wood Parts 2 x 1125 Side Wall Top Hardware 4 x 8 x 2 1 2 Wood Screw 2 x 8 x 2 Wood Screw 1115 Right Roof R...

Page 49: ...Side Wall Panels B Put Side Wall Panel in the grooves of 1107 Side Wall Sill then slide into grooves of Left and Right Posts Make sure the notch at the bottom is always on the right side of the panel...

Page 50: ...tach 1125 Side Wall Tops to each 1144 Short Post Assembly with one 8 x 2 Wood Screw per post F11 4 and F11 7 1125 Side Wall Top Side Wall Panel 1107 Side Wall Sill Note direction of angle Wood Parts 4...

Page 51: ...Side Wall Sills Make sure the notch at the bottom is always on the right side of the panel from outside of the assembly The UV coated side must be to the outside of the assembly F11 8 Components 4 x...

Page 52: ...PANEL Note Space washers 2 from each edge of post and cnetre the third one PRE DRILL thru each panel Repeat for all the other POLYCARB SIDE PANELS G On the top of each Side Wall Panel place one PC U C...

Page 53: ...rooves in 1114 Middle Roof Rafters face the sides and should line up with grooves in 1123 Roof Peak Use 1188 Guide Spacers in grooves of 1123 Roof Peak and 1114 Middle Roof Rafter for accurate positio...

Page 54: ...ews Hardware B Flip the assembly over then attach each 1114 Middle Roof Rafter to 1123 Roof Peak with one 10 x 4 Wood Screw per rafter Screws are installed at an angle F12 3 F12 3 3 x 10 x 4 Wood Scre...

Page 55: ...roove in 1124 Vent Roof Peak Use 1188 Guide Spacers in grooves of 1124 Vent Roof Peak and 1114 Middle Roof Rafter for accurate positioning then attach with two 8 x 3 Wood Screws per rafter Remove 1188...

Page 56: ...h rafter Attach 1126 Inside Vent Block to 1114 Middle Roof Rafters with three 8 x 2 Wood Screws per block F13 3 and F13 4 8 X 2 Wood Screws Step 13 Vent Roof Peak Assembly Part 2 F13 3 F13 4 Hardware...

Page 57: ...rooves of 1114 Middle Roof Rafters and 1128 Bottom Vent Block for accurate positioning then attach rafters to block with one 10 x 4 Wood Screw per rafter Remove 1188 Guide Spacers F13 5 and F13 6 Step...

Page 58: ...7 and F13 8 Step 13 Vent Roof Peak Assembly Part 4 Hardware Wood Parts 1 x 1170 Vent Roof Panel 1 x 1187 Vent Roof Panel Block 3 x 8 x 1 1 4 Wood Screw 8 x 1 1 4 Wood Screw 1170 Vent Roof Panel 1170 V...

Page 59: ...d tight to 1124 Vent Roof Peak 1187 Vent Roof Panel Block faces down F13 9 G Place Continuous Hinge on 1124 Vent Roof Peak and 1170 Vent Roof Panel and attach with 34 8 x 1 2 Pan Screws Do not install...

Page 60: ...Have one person hold assembly in place until secure F14 1 and F14 2 B Repeat Step A for Roof Peak Assembly 1123 Roof Peak placed on 1121 Upright Insides tight to 1184 Peak Spacer 1115 Right Roof Rafte...

Page 61: ...Peak with two 10 x 4 Wood Screws per end F14 7 and F14 8 8 X 3 Wood Screws Connects ROOF PEAK ASSEMBLY to VENT ROOF PEAK ASSEMBLY 10 X 4 Wood Screws Connects MID ROOF RAFTERS to VENT ROOF PEAK 10 X 4...

Page 62: ...in small beads and smoothed out F14 9 and F14 10 F14 9 F14 10 Components Sealant 1124 Vent Roof Peak 1123 Roof Peak 1124 Vent Roof Peak 1123 Roof Peak Sealant See page 6 for Warning and First Aid Inf...

Page 63: ...11 and F14 12 10 x 5 5 8 Wood Screws Connects the VENT ROOF PEAK ASSEMBLY and ROOF PEAK ASSEM BLY to SHORT POST AND MID POST 10 x 5 5 8 Wood Screws Connects the VENT ROOF PEAK ASSEMBLY and ROOF PEAK...

Page 64: ...F15 2 and F15 3 B Make sure 1127 Vent Roof Rafter overhangs 1125 Side Wall Top by 3 4 1 91 cm then attach to 1110 Mid Posts with one 10 x 5 5 8 Wood Screw F15 1 and F15 4 Hardware 10 x 5 5 8 Wood Scr...

Page 65: ...ingle Spring Window Opener Note the opener is in the closed position prior to attaching to the unit F16 1 B Insert pin in B hole of the push rod F16 5 C From inside the assembly centre Single Spring W...

Page 66: ...o Roof Panels and two Small Roof Rafter Panels up to fit in the grooves of 1124 Vent Roof Peak and 1128 Bottom Vent Block Make sure the notch at the bottom is always on the right side of the panel Hol...

Page 67: ...a gap of approximately 1 8 3 175 mm between end of Roof Panel and PC U Channel F17 4 F17 5 and F17 6 E Attach bottom of each Roof Panel and Small Roof Panel to 1125 Side Wall Tops using three 10 x 1 1...

Page 68: ...s and smoothed out F18 1 F18 2 and F18 3 Sealant F18 2 F18 1 F18 3 Small Roof Panel Roof Panel Roof Panel Roof Panel Step 18 Apply Sealant Part 1 Note All surfaces to be clean dry dust and grease free...

Page 69: ...pplied in small beads and smoothed out F18 4 and F18 6 Sealant Use caulking to seal the PLYCARB panels NOTE Use caulking for the inner roof POLYCARB PANELS as well F18 5 F18 4 Side Panel Side Panel Le...

Page 70: ...nels Sealant should be applied in small beads and smoothed out F18 7 and F18 8 PC U Channel PC U Channel F18 8 Note All surfaces to be clean dry dust and grease free before application with temperatur...

Page 71: ...r gusset F19 1 F19 2 F19 3 and F19 4 B On one Side Wall at each post measure 31 78 74 cm up from the top of 1107 Side Wall Sill and make a mark Place one 1138 Wooden Gusset on each post so the top of...

Page 72: ...to the Back Wall place two 1139 Short Upper Shelves on 1138 Wooden Gussets so they are tight to each other Attach with four 8 x 1 1 4 Wood Screws per shelf F19 5 and F19 6 Hardware 8 x 8 x 1 1 4 Wood...

Page 73: ...ach 1139 Short Upper Shelves to 1138 Wooden Gussets with two 8 x 1 1 4 Wood Scews per shelf F19 7 Locate the centre of each SHELF BOARD along the width where they meet each WOODEN GUSSET then PRE DRIL...

Page 74: ...4 Connects SHELF BLOCK to the SHORT UPPER SHELF NOTE One end is tight to WOODEN GUSSET 8 X 1 1 4 Wood Screws Connects SHELF BLOCK to the SHORT UPPER SHELF NOTE One end is tight to WOODEN GUSSET 8 X 1...

Page 75: ...lock The ends with the pilot holes go on the Front Wall side the other end is tight to 1141 Shelf Block Attach 1140 Long Upper Shelves to Front Wall side 1138 Wooden Gusset with two 8 x 1 1 4 Wood Scr...

Page 76: ...l place one 1134 Shelf Gusset on both 1108 Left Post and 1109 Right Post so 1134 Shelf Gussets fit tight to bottom of each 1107 Side Wall Sill Attach to posts and sill with two 8 x 2 1 2 Wood Screws p...

Page 77: ...attach to 1134 Shelf Gusset and posts with three 8 x 2 1 2 Wood Screws per joist The screw going into the post is installed at an angle F20 3 and F20 4 8 x 2 1 2 Wood Screws Connects LONG SHELF JOIST...

Page 78: ...f Joists with two 8 x 2 1 2 Wood Screws F20 5 F20 6 F20 7 and F20 8 F20 5 F20 6 Step 20 Lower Shelf Assembly Back Wall Part 3 Back Wall Side Shelf Side Notice 4 holes on same side as Side Wall Shelf 8...

Page 79: ...Front to 1135 Shelf Joist with three 8 x 2 Wood Screws F20 9 F20 10 and F20 11 Step 20 Lower Shelf Assembly Back Wall Part 4 F20 9 8 x 2 Wood Screw Connects SHELF JOI end 8 x 2 Wood Screws Connects S...

Page 80: ...ist attach one 1134 Shelf Gusset with one 8 x 2 1 2 Wood Screw F20 12 G Repeat Steps E and F for a second Joist Gusset Assembly F20 12 Step 20 Lower Shelf Assembly Back Wall Part 5 Hardware 2 x 10 x 1...

Page 81: ...F20 15 J Make sure Joist Gusset Assembly sits 5 8 1 59 cm down from the top of 1132 Shelf Front and is centred over the pilot holes Attach 1132 Shelf Front to 1135 Shelf Joists with one 8 x 2 1 2 Woo...

Page 82: ...it is in alignment with the notch in 1133 Shelf Side The distance from the top of 1135 Shelf Joist to the top of 1133 Shelf Side is 5 8 1 59 cm Attach 1133 Shelf Side to 1135 Shelf Joist with three 8...

Page 83: ...Left Post and Door Post 1135 Shelf Joist faces away from the Front Wall Make sure 1133 Shelf Side is level then attach to Front Wall with four 8 x 2 1 2 Wood Screws F21 3 and F21 5 REMOVE CORNER BRAC...

Page 84: ...s are towards the Back Wall Attach 1132 Shelf Front to 1135 Shelf Joists with two 8 x 2 1 2 Wood Screws F21 6 F21 7 F21 8 and F21 9 8 x 2 1 2 Wood Screw 1132 Shelf Front Hardware 2 x 8 x 2 1 2 Wood Sc...

Page 85: ...the other side of 1135 Shelf Joist attach one 1134 Shelf Gusset with one 8 x 2 1 2 Wood Screw F21 10 Hardware 1 x 10 x 1 1 4 Pan Screw 1 x 8 x 2 1 2 Wood Screw Wood Parts 1 x 1135 Shelf Joist 1 x 113...

Page 86: ...ne 10 x 1 1 4 Pan Screw F21 11 F21 12 and F21 13 H Attach 1134 Shelf Gusset to 1110 Mid Post with one 8 x 2 1 2 Wood Screw F21 11 F21 12 and F21 13 I Make sure Joist Gusset Assembly sits 5 8 1 59 cm d...

Page 87: ...the Side Wall place four 1131 Shelf Tops on 1135 Shelf Joists Attach 1131 Shelf Tops to end joists with four 8 x 1 1 4 Wood Screws per shelf Find the centre of middle 1135 Shelf Joist then attach 113...

Page 88: ...nd F22 5 D Find the centre of 1135 Shelf Joist then attach 1131 Shelf Tops to 1135 Shelf Joist with one 8 x 1 1 4 Wood Screw per board F22 4 and F22 5 8 X 1 1 4 Wood Screw IMPORTANT pre drill into She...

Page 89: ...ost flush to the inside edges Attach 1130 Door Blocks to each post with four 8 x 1 1 4 Wood Screws per board F23 1 F23 2 and F23 3 Attach DOOR TOP BLOCK and DOOR BLOCK to the inside of the door frame...

Page 90: ...the top and 3 7 62 cm from the bottom of the panel then attach two Square Hinges using three 7 x 3 4 Wood Screws per hinge F23 4 and F23 5 D On the same side as the top and bottom Square Hinges attac...

Page 91: ...g for the 1175 Door Panel placement F23 6 F Place 1175 Door Panel in door opening and attach Square Hinges to Door Post with three 7 x 3 4 Wood Screws per hinge Remove 1188 Guide Spacers F23 7 and F23...

Page 92: ...F23 10 H Close 1175 Door Panel to determine placement of the Ear of the Sliding Barrel Bolt on the Door Post then attach with two 10 x 1 1 4 Black Pan Screws F23 9 and F23 11 Hardware 5 x 10 x 1 1 4 B...

Page 93: ...of 1130 Door Block The long side will be against 1130 Door Block and bottom of arch flush to the bottom of 1143 Front Gable Beam Attach 1142 Closer Block to Door Post and 1143 Front Gable Beam with th...

Page 94: ...42 Closer Block 10 x 1 1 4 Black Pan Screw 1129 Top Door Block A Measure 1 2 54 cm down from 1129 Top Door Block and 1 2 1 27 cm in from edge of 1142 Closer Block then place Bottom Tube Bracket on 114...

Page 95: ...F25 2 and F25 3 C Attach Top Tube Bracket to the end of the Tube with Long Dowel and attach a Rubber Cap F25 3 Step 25 Attach Door Closer Part 2 130 Angle Bracket F25 2 Rod Tube F25 3 Bottom Tube Brac...

Page 96: ...D Close the door and attach Top Tube Bracket to 1175 Door Panel with two 10 x 1 1 4 Black Pan Screws Make sure tube is level F25 4 and F25 5 Step 25 Attach Door Closer Part 3 10 x 1 1 4 Black Pan Scre...

Page 97: ...r Block Do not tighten screw the chain needs to move easily F25 6 10 x 1 1 4 Pan Screw Chain Step 25 Attach Door Closer Part 4 Hardware 3 x 10 x 1 1 4 Pan Screw Components 1 x Chain with Chain Bracket...

Page 98: ...Roof Rafter on both roof assemblies F26 1 and F26 2 Components 5 x 3 8 Eye Lag 3 8 EYE LAG x5 Attach an eye lag to each roof rafter with a hole located on the bottom face 3 8 EYE LAG x5 Attach an eye...

Page 99: ...two 10 x 1 1 4 Pan Screws This provides warnings concerning safety and important contact information A tracking number is provided to allow you to get critical information or order replacement parts...

Page 100: ...100 support yardistrystructures com...

Page 101: ...101 support yardistrystructures com NOTES...

Page 102: ...Comments Comentarios Commentaires Mail To Enviar por Correo a Envoyer par courrier Mail To Enviar por Correo a Envoyer par courrier Yardistry 375 Sligo Road West PO Box 10 Mount Forest Ontario Canada...

Reviews: