background image

16940

STOP!

STOP!

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-800-844-9273

or email:

customerservice@yardline.net

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

Summary of Contents for 16940

Page 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Page 2: ...This page intentionally left blank...

Page 3: ...gineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are li...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...of additional materials not included x2 x8 2 x 4 x 8 5 x 10 x 243 8 cm Treated Lumber Cut to 3 2 x 4 x 117 5 x 10 x 297 2 cm ea 3 7 6 cm Hot Dipped Galvanized Nails Optional 12 30 5 cm spacing Standa...

Page 6: ...6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1 GAA DOOR OO x2 1 1 2 x 2 1 2 x 69 3 8 x 6 3 x 175 3 cm 4 x8 6 x 24 15 2 x 61 cm GUSSET x10 2 x 4 x 75 1 4 5 1 x 10 2 x 191 1 cm ECN x2 3 8 x 5 7 8...

Page 7: ...6 5 1 x 10 2 x 243 8 cm TP 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 1 x 4 x 96 2 5 x 10 2 x 243 8 cm x1 KP WALL PANEL DOORS PARTS LIST x6 3 8 x 48 x 76 1 x 121 9 x 193 cm x1 LEFT DOOR x1 RIGHT DOOR x1...

Page 8: ...9 cm 2 5 0 cm 3 7 6 cm 2 5 1 cm 1 1 2 3 8 cm x2 1 2 5 cm x1 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged seperately special coating x12 1 2 5 cm x4 x1 1 1 4 x8 3 Point Door Locking Mechanism x1 1 1 4 x...

Page 9: ...see the following page CONCRETE Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 8 Block 4 Block Grav...

Page 10: ...ates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2 x 4 x 10 5...

Page 11: ...cm PARTS REQUIRED FLOOR FRAME HINT For easier nailing stand on frame 2 1 Use two 3 nails at each mark Orient parts as shown on flat surface Measure and mark BEGIN You have finished your floor frame P...

Page 12: ...urement will be approximately 153 11 16 390 4 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of th...

Page 13: ...that the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 153 11 16 390 4 cm Fig...

Page 14: ...e left edge Use grid lines on panel or chalk lines for 2 nails 6 apart on edges and 12 apart inside panels 5 7 6 x1 5 8 x 48 x 96 1 6 x 122 x 243 8 cm x1 5 8 x 23 7 8 x 96 1 6 x 60 6 x 243 8 cm x100 2...

Page 15: ...the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure durin...

Page 16: ...wo 3 screws Measure over 120 3 4 and install a second CLA flush to the floor deck CLA will overhang the floor Secure using two 3 screws 120 3 4 306 7 cm IMPORTANT MEASUREMENT Fig A It is very importan...

Page 17: ...t using glue and 12 2 nails No need to use jig for 2nd gusset 4 3 2 Keep ECN firm against outside CLA s as shown Fig A Rafters should touch at tips Fig A Apply glue to rafters where gusset will attach...

Page 18: ...AP 1 4 1 9 cm GAP ECN x2 ECN x2 Fig A Fig B Fig C Glue where gusset installs Keep rafters firmly against CLA at both ends when securing gusset You have finished assembling your rafters Gable end rafte...

Page 19: ...OSB Glue both sides of OSB Glue both sides Place 1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Nail using 3 nails in the pattern shown 2 1 BEGIN You have assembled y...

Page 20: ...x1 Pre Assembled Header Pre Assembled Header BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 2 104 1 2 265 4 cm 90 3 4 230 5 cm 68 1 2 174 cm 68 1 2 174 cm 72 182...

Page 21: ...to top as shown Secure panel with two 2 nails 6 apart Repeat STEP 3 to attach the right 48 x 76 panel 4 3 48 x 76 121 9 x 193 cm x1 LEFT x1 RIGHT Maintain Flush Maintain Flush Primed side up Primed si...

Page 22: ...temporary support HJ to frame holding 64 opening as shown using 3 screws 6 5 You have finished building your front wall FINISH Maintain Flush HJ Flush Flush Maintain Flush Primed side up Primed side u...

Page 23: ...1 2 113 cm 92 1 2 235 cm 68 1 2 174 cm 68 1 2 174 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm 113 287 cm 113 287 cm x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 2 x 4 x 44 1 2 5 1 x 10 2 x 113 cm STL...

Page 24: ...n right side Maintain 3 4 measurement along edge 22 BACK WALL 48 x 76 121 9 x 193 cm PARTS REQUIRED x1 x48 2 5 1 cm 12 30 5 cm 12 30 5 cm 3 4 GAUGE BLOCK 3 4 GAUGE BLOCK BEGIN HERE For squareness main...

Page 25: ...quareness maintain flush along panel edges 48 122 cm 23 7 8 60 6 cm Flush Place 23 7 8 x 76 panel flush with installed 48 x 76 panel edge Ensure panel is flush at top Secure using 2 nails 6 apart on e...

Page 26: ...ails YOU WILL BUILD TWO IDENTICAL SIDE WALLS TM x5 TP TP 48 121 9 cm 96 243 8 cm 72 182 9 cm 24 61 cm 1 1 2 3 8 cm HINT For easier nailing stand on frame BEGIN 1 Use two 3 nails at each mark Orient pa...

Page 27: ...4 gap on right side Maintain 3 4 measurement along edge x48 2 5 1 cm Install all panels with primed side up 25 SIDE WALLS 12 30 5 cm 12 30 5 cm 48 x 76 121 9 x 193 cm x1 3 4 GAUGE BLOCK 3 4 GAUGE BLOC...

Page 28: ...ur side walls FINISH 8 7 Carefully flip the side wall over Repeat steps 1 7 to build second side wall 48 122 cm 6 15 2 cm Flush Maintain Flush For squareness maintain flush along panel edges Place 48...

Page 29: ...om plates to floor using 3 nails fig A 3 7 6 cm x10 x2 x24 BACK WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate BEGIN Stand back wall on floor Center back wall assembly on the 120 304 8...

Page 30: ...hed installing your left wall FINISH Secure left wall to floor using 3 nails Fig C Nail back wall panel to left wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 6 15 2 cm Flush Fig A Fig B 2 5 1 cm Nai...

Page 31: ...on 1 Panel Flush 120 304 8 cm Nail front wall panel to left wall stud using 1 1 2 nails 6 apart Fig B 3 4 2 6 15 2 cm Fig B 1 1 2 3 8 cm Nails Fig C 2 7 6 cm Screw 2 5 1 cm Screw Move to the bottom of...

Page 32: ...hit floor frame Fig D 5 Secure front wall bottom plates to floor using 3 nails Fig D Remove temporary braces 6 7 3 7 6 cm x6 2 5 1 cm x14 FRONT WALL INSTALLATION 3 7 6 cm Nails Nail 2 nails first 2 5...

Page 33: ...BEGIN Remove temporary supports and stand right wall on floor It is important to secure the right wall in the following order Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flus...

Page 34: ...and back panels to right wall studs using 1 1 2 nails 6 apart Fig D 2 5 1 cm Nails Angle nail to hit floor frame FINISH 4 3 5 6 1 1 2 3 8 cm Nails Fig E 3 7 6 cm Screw Fig D Secure front and back wal...

Page 35: ...1 9 cm 24 3 8 61 9 cm Preassembled Rafter 2 gusset Preassembled Rafter 1 gusset Align over studs BEGIN HERE Fig A Fig B Tight to side wall 3 3 7 6 cm Screws Flush to outside of panel Flush to outside...

Page 36: ...n securely Attach temporary support GAA with two 1 1 4 screws as shown Tighten securely OO GAA Tighten screws securely OFFSET 4 3 7 6 cm Screws 1 1 4 3 cm Screws 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OF...

Page 37: ...10 3 screws as shown 2 3 4 3 7 6 cm Screws into door trim 3 7 6 cm Screw 3 7 6 cm x13 OO Flush against wall panels Fig A OO Attach temporary support OO as a ledger board flush under wall panels for d...

Page 38: ...tal threshold between doors and secure using eleven 3 4 special coating screws into floor as shown Fig C 9 6 Secure horizontal door rails AH with four 3 4 screws from behind to center of doors as show...

Page 39: ...ind frame near edge before installing to seal window 3 4 1 9 cm Screws x8 You have installed your doors over door trim transom windows and threshold FINISH 3 4 1 9 cm x8 INSIDE OF DOORS x2 Transom Win...

Page 40: ...tically on the right door in the door opening offset 1 2 5 cm from the edge of door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH 3 Secure using 7 2 screws through outside trim into OO Fi...

Page 41: ...ocation of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You h...

Page 42: ...DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws 1 1 4 Pan Head Screw 1 1 4 Pan Head Screw Secure backplate with 1 screws and handle with 1 1 4 screws as shown x1 1 1 4 x8 3 Point Door Locking Me...

Page 43: ...ng locations of brackets and plates 3 4 Tech Screw Washer Washer UPPER BRACKET with offset Orient bracket as shown Washer Washer Plate 3 4 Tech Screw 1 1 4 Pan Head Screw Orient bracket as shown LOWER...

Page 44: ...42 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR IMPORTANT This rod to edge of door Make sure rods are straight up and down when locating brackets BOTTOM of Door...

Page 45: ...43 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor PLATE FRAMING PLATE FLOOR VERTICAL RODS Drill with 3 8 bit to 2 depth...

Page 46: ...p 1 3 4 4 5 cm Fig A Measurement UV on flat Measure distance from over door trim to top plate Fig A Orient UV on flat as shown Transfer the measurement from Fig A onto the left front gable panel Place...

Page 47: ...el flush to installed center panel Ensure panels are flush Secure panel to UV using 1 1 2 nails You have finished assembling your front gable unit FINISH Flush Flush Maintain Flush Maintain Flush 1 3...

Page 48: ...ttaching your front gable FINISH Working inside secure gable unit with 3 screws toe screwed into UV at an angle as shown in Fig B 3 2 5 1 cm x37 Set front gable unit on top plate centered on wall rest...

Page 49: ...able panel as shown and secure using 1 1 2 nails 2 1 BEGIN 3 4 Place second UV as shown Place gable center panel use panel with vent hole flush to installed left panel Ensure panels are flush Secure p...

Page 50: ...NAIL FIRST 2 5 1 cm NAIL FIRST 2 5 1 cm 6 15 2 cm Back Gable Unit BEGIN 1 2 Continue nailing lower edge of panels into top plate using 2 nails 6 apart as shown Secure upper edge of panels into rafter...

Page 51: ...A x8 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x32 Fig A Flush Flush Flush Flush Flush Panel overhang 1 1 8 Flush Flip over gable ladder sub assembly and attach ECA to four CLA using 3 screws Fi...

Page 52: ...unit Ensure gable unit is ush against installed gable unit at the top Secure right and left gable unit s framing to rafter using 3 screws as shown Fig C 2 1 BEGIN Place the left gable unit onto rafte...

Page 53: ...rafter Hold rafters centered and at measurements shown Fig B 3 2 Attach a 27 1 4 x 48 roof panel with a 3 4 measurement on the 3rd middle rafter Fig C flush to the installed panel and flush to the ed...

Page 54: ...ed panels Secure panel with two 2 nails in the corners Secure the roof panels using 2 nails 6 apart on edges and 12 apart inside panel 6 15 2 cm 12 30 5 cm 12 30 5 cm Flush Two Nails Flush You have fi...

Page 55: ...all Fig C Fig D Secure using 20 2 finish nails Ensure soffit boards are flush at peak and to each other Fig B Fig D x4 3 8 x 7 7 8 x 73 5 16 1 x 20 x 186 2 cm x40 2 5 1 cm 2 1 BEGIN You have finished...

Page 56: ...ends Fig B Toenail at center seam Fig C Secure using four 2 finish nails two in each rafter Repeat STEPS 1 2 to attach eave side soffit boards on the opposite side Ensure soffit boards are flush at ra...

Page 57: ...e out flush with roof panels Fig A and installed fascia seam as shown Fig B Secure using 2 finish nails into rafter ends Repeat STEPS 1 2 to install fascia on opposite side of shed You have finished i...

Page 58: ...own Repeat STEP 2 to attach fascia board on the front side Front side is without 3 1 4 x 5 7 8 shim 3 You have installed your back gable fascia FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1...

Page 59: ...ail at top as shown Repeat STEPS 1 2 to attach trim to all four corners Finish attaching trim flush to corners using 5 2 finish nails as shown You have attached your corner trim 3 2 73 7 8 187 6 cm 73...

Page 60: ...left side Secure shelf supports at shown height with three 2 nails 1 BEGIN 2 x18 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x6 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 PARTS REQUIRED AE x5 x1 2 5 1...

Page 61: ...support as shown 3 FINISH You have finished installing your shelf 4 x14 2 5 1 cm 7 16 x 11 7 8 x 23 7 8 1 1 x 30 2 x 60 6 cm x1 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x 4 x 23 7 8 2 5 x 10 2 x...

Page 62: ...lue across RL and TP as shown Fig A Hold parts TP and RL flush and aligned 1 3 4 4 4 cm 1 3 4 4 4 cm Glue RL TP TP Flush Flush Flush 3 7 6 cm Nails x12 RL 2 3 5 Assemble joist with 3 nails in a stagge...

Page 63: ...7 8 5 1 x 10 2 x 304 5 cm x1 Pre Assembled Loft Joist 7 8 Clamp or hold Pre Assembled Loft Joist in place flush under top plate Drill through joist and wall studs with 7 16 drill bit as shown Secure...

Page 64: ...oad not to exceed 400 lbs 181 kg evenly distributed across loft FINISH You have finished installing your loft 8 20 3cm 2 5 1 cm Nails Flush Flush 9 Install loft panel centered over loft joists Secure...

Page 65: ...IN Position and level collar tie on 3rd rafter from loft HINT For best appearance install collar tie on rafter facing away from door opening Attach with 2 nails as shown You have finished installing y...

Page 66: ...REQUIRED FINISH 2 BEGIN 1 Locate vent in the gable wall as shown You have finished installing your gable vent Secure using 1 screws GABLE VENT 15021 x4 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pan H...

Page 67: ...f you have a gable vent Measure and mark vent hole in wall as shown Cut out marked opening Caulk behind vent flanges Secure using 1 2 screws You have finished installing your wall vent x6 1 2 1 3 cm x...

Page 68: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 69: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 70: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 71: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 72: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 73: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 74: ...olas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola...

Reviews: