background image

User’s

Manual

Model OR8TBG

Terminal Box

IM 12C04W01-01E

IM 12C04W01-01E

2nd Edition

Summary of Contents for OR8TBG

Page 1: ...User s Manual Model OR8TBG Terminal Box IM 12C04W01 01E IM 12C04W01 01E 2nd Edition...

Page 2: ...the OR8TBG Terminal Box for the FLXA402 or the PH450G For the FLXA402 4 Wire Converter refer to IM 12B01F01 02EN For the PH450G pH ORP converter refer to IM 12B07C05 01E Media No IM 12C04W01 01E 2nd...

Page 3: ...in this user s manual the protection provided by this instrument may be impaired If any protection or safety circuit is required for the system controlled by the product or for the product itself prep...

Page 4: ...omponents which are out of scope of warranty stated in instruction manual Failure caused by usage of software hardware or auxiliary equipment which Yokogawa Electric did not supply Failure due to impr...

Page 5: ...Blank Page...

Page 6: ...ndard Specifications 1 1 1 2 Model and Suffix Codes 1 1 1 3 External Dimensions 1 2 2 Installation and Wiring 2 1 2 1 Installation 2 1 2 1 1 Installation Location 2 1 2 1 2 How to Mount It 2 1 2 2 Wir...

Page 7: ...Blank Page...

Page 8: ...able outlet Cable mounted in cable gland For sensor cable 13 mm hole punch out using supplied tool when wiring note Cable gland polycarbonate resin equivalent to JIS A8 is supplied on the sensor cable...

Page 9: ...ing F0101 ai Unit mm For conduit construction Adapter option Pipe mounting hardware example Waterproof gland 13 185 15 27 70 0 2 70 0 2 100 15 3 10 hole 4 5 5 hole 75 0 2 Wall mounting hardware 48 Nom...

Page 10: ...sor as possible 2 1 2 How to Mount It Terminal box can be mounted on bracket pipe nominal 50A size or wall However for pipe or wall mounting order and use the optional mounting hardware This mounting...

Page 11: ...0m depending on your specifications Cable gland JIS A8 equivalent Optinal Extension Cable Unit mm Figure 2 4 Wiring 2 2 1 Processing of Cable Inlet Hole Open the cable inlet hole in terminal box using...

Page 12: ...nut check the symbol on each core wire then connect each core wire to the corresponding terminal F0206 ai CONVERTER SENSOR Figure 2 6 Connecting Sensor Cable 4 Mount the cable gland in the cable inle...

Page 13: ...body and gasket in order The nut is mounted after pulling the cable through it Furthermore use heat shrink tube around the cable gland after mounting it 2 Pull the cable inside Then after pulling cab...

Page 14: ...e cover of the terminal box and check for moisture If the inside is very damp use a hair drier to dry the inside of the box If you have a spare desiccative replace the desiccative approx 30 g of silic...

Page 15: ...Blank Page...

Page 16: ...18 19 20 K9141XU K9141XM K9141XN G9303NB K9141XD K9020XR K9141XT Y9304LB K9141XQ Y9405LB K9141YE K9141XA K9141SA K9141SB D0117XL A Y9508JU K9141SC K9149SC Y9508JU 1 2 2 2 1 1 1 2 1 2 1 1 1 1 1 4 1 1...

Page 17: ...able Assembly Cable length 3 m Cable length 7 m Cable length 10 m Item Part No Description Qty Item 2 3 4 5 6 Part No K9141SR B1002JZ K9141ST K9141TX K9141TY Description Punch Gland JIS A15 Sheet Cond...

Page 18: ...ion Record Manual Title Model OR8TBG Terminal Box Manual No IM 12C04W01 01E Nov 2018 2nd Edition Added FLXA402 Sep 2006 1st Edition Newly published Yokogawa Electric Corporation 2 9 32 Nakacho Musashi...

Page 19: ...Blank Page...

Reviews: