background image

Installation Guide

AL30B & AL40B

Version: 1.0

Summary of Contents for AL30B

Page 1: ...Installation Guide AL30B AL40B Version 1 0...

Page 2: ...e correct set of screw C as per your door thickness 16 5mm 30mm 35mm 1 What s In the box Outdoor unit Indoor unit Latch Gasket Strike box Mounting plate Screw A Screw B Keys Screw C For door thickness...

Page 3: ...Outdoor unit 2 Installation Diagram AL30B Battery cover Latch Screw B Door Screw C Gasket Strike box AAAlkaline Screw A 2 not included Battery unit Indoor...

Page 4: ...f the door Below is the graphical representation of handing in reference to your location outside the room Please read all the in this manual or call customer care before returning the product to the...

Page 5: ...Drilling holes in the door 4 1 Paste the installation template at a desired handle height 2 Mark the holes and start drilling the holes Handle center line 35mm 53mm 60mm...

Page 6: ...al wire runs over the center as shown Backset is the distance from the edge of the door to the center of the hole drilled on the door The default backset is 60mm if you want to change the backset to 7...

Page 7: ...fore installing the latch make sure the latch bolt is in extended Locked position and the UP arrow direction is facing upwards UP 6 Installing the latch Secure the latch by inserting the screws B 1 1...

Page 8: ...ing it through the drilled hole Note If the direction of the door is right hand the rotate the highlighted spindle to the extreme right and if the door is left hand then rotate it to the extreme left...

Page 9: ...e with gasket on the door 8 Attach the mounting plate to the gasket and route the cable through the hole on the mounting plate and gasket Place the gasket and mounting plate on to the door and use scr...

Page 10: ...ector to the port on indoor unit Place the indoor unit properly on the mounting plate push and adjust the excess cable to the left Then use screws A to secure indoor unit The knob dot must be in direc...

Page 11: ...k you must perform initialization process as explained in below steps 1 Press and hold the reset button then remove one battery and place it back again keep holding until the lock prompts Restore to d...

Page 12: ...strike box is in level of latch bolt then use installation template to drill holes 2 Align the strike box and plate with the drilled hole and use screws B to secure them 14mm 70 127 35mm 1 48 127 21 5...

Reviews: