1 - 26
ForeRunner
ATM Switch Network Configuration Manual
Configuring PVCs
To configure the shaped originating paths as shown in the example in Figure 1.14 and
Figure 1.15, perform the following steps:
1.
First, create the UPC contract to be used on the through paths that are going to be
output on the shaping port on the Series D network module to the WAN.
myswitch::configuration upc> new 2 cbr 42452 noGCRA -scheduling smoothed
NOTE
You must use the
-noGCRA
option to disable
policing. This allow bursts without dropping
cells. The shaped rate is equal to PCR for CBR
traffic and equal to SCR for VBR traffic. You must
also use the
smoothed
scheduling option so that
a rate group is created when a PVC or PVP is
configured with this UPC.
2.
Next, delete any existing path(s) on the looping port as follows:
myswitch::configuration upc> conf vpt
myswitch::configuration vpt> conf vpt del 1a2 0
NOTE
By default, path 0 is the only path that exists. If
path 1 already exists, you must delete it using
the command
conf
vpt
del
1a2
1
.
3.
Recreate the paths on the looping port using the
-loopvpi
option to ensure that
cells from the WAN port get looped back into the terminating path.
myswitch::configuration vpt> new 1a2 0 -loopvpi 2
myswitch::configuration vpt> new 1a2 1 -loopvpi 3
4.
Create a PVP to the shaping port on a Series D network module and apply the UPC
contract that you created in step 1 so that it shapes the cells.
myswitch::configuration vpt> conf vpc
myswitch::configuration vpc> new 1a2 2 1a1 2 -upc 2
myswitch::configuration vpc> new 1a2 3 1a1 3 -upc 2
Summary of Contents for forerunner series
Page 6: ......
Page 16: ...TOC 10 ForeRunner ATM Switch Network Configuration Manual Table of Contents ...
Page 20: ...LOF 4 ForeRunner ATM Switch Network Configuration Manual List of Figures ...
Page 22: ...LOT 2 ForeRunner ATM Switch Network Configuration Manual List of Tables ...
Page 30: ...viii ForeRunner ATM Switch Network Configuration Manual Preface ...
Page 144: ...3 58 ForeRunner ATM Switch Network Configuration Manual Configuring an Emulated LAN ...
Page 180: ...6 12 ForeRunner ATM Switch Network Configuration Manual ATM Forum PNNI ...
Page 220: ...9 6 ForeRunner ATM Switch Network Configuration Manual Configuring Timing ...
Page 300: ...D 24 ForeRunner ATM Switch Network Configuration Manual Configuring FramePlus Modules ...
Page 308: ...Acronyms 8 ForeRunner ATM Switch Network Configuration Manual Acronyms ...
Page 346: ...Glossary 38 ForeRunner ATM Switch Network Configuration Manual Glossary ...
Page 352: ...Index 6 ForeRunner ATM Switch Network Configuration Manual Index ...